Mining (Major/Minor/Industries)

Home / Mining (Major/Minor/Industries)


  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Are Patti commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Ghiroli Patti Dug commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Mehhnarbunga Patti Kande commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Kthayatbara Patti Talla Katyour commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Sainj  Patti Talla Katyour commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Belonasera commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Pandrhpali Patti Are commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Gola of Lot name Apar Gola Dehara Amritpur Masi commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Gola of Lot name Apar Gola Bhorsa, Ameyan commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Koshi  of Lot name Koshi ne Jogi Naili. Lohali. Jorasi. Mansi. Noura commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Khaima of Lot name Khairna River Patti Bargal commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Khaima of Lot name Khairna.Sirsa  commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Nihal of Lot name Nihal River Thapla commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at River Koshi of Lot name Lower Koshi Chhoi River commissioned by Directorate of Industries Uttarakhand
  • Environmental Impact Assessment (EIA) of 6MW Captive Power Generation at Moradabad Road Kashipur commissioned by Siddheshwari Paper, Uttarakhand. 
  • Environmental Impact Assessment (EIA) of Mining Project at Kiroranala, Champawat, commissioned by Uttranchal Forest Development Corporation..
  • Environmental Impact Assessment (EIA) of Mining Project at Nihal, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-2, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-3, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Jakhan-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Jakhan-2, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Chandanav-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nandhor, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nandhor Kailash, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Gaula, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Kosi, Nainital, commissioned by Uttranchal Forest Development Corporation
  • Environmental Impact Assessment (EIA) of Mining Project at Dabka, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Enviroment Impact Assessment (EIA) of Project Granite Mine M.L.No-514/12 at Village –SAKADRA Tehsil -Pali,Rajasthan
  • Enviroment Impact Assessment (EIA) of Project Masonary stone Mining M.L.NO-32-03 at village Kalyanpura Tehsil -Kutputli Rajasthan. 
  • Enviroment Impact Assessment (EIA) of our River Sand Mining at Majhouli deoria(U.P)
  • Enviroment Imapct Assessment (EIA) of our Bausxite mine at village Nandana,Gujarat 
  • Enviroment  Impact Assessment (EIA) of our  Sand mining  veer bharthokar at khushinagar(U.P)
  • Environment Impact Assessment (EIA) of  our Granite M.L. 17/13 at Village Sakadara, Dist. Pali, Rajasthan commissioned by M/s Baghmal Marble Pvt. Ltd.
  • Environment Impact Assessment (EIA) of our sand mine project at Bhulsi Khadar, Dist.-Hamirpur, State-UP commissioned by Ramesh Chandra Mishra
  • Environment Impact Assessment (EIA) of sand stone mine at vill. Dhara, Dist. Mahoba, U.P commissioned by Smt. Nutan Singh.
  • Environment Impact Assessment (EIA) of Silica Sand Mines at Allahabad (U.P) commissioned by Rajesh Kumar Chawla.
  • Environment Impact Assessment (EIA) of Silica Sand mines at Chitrakoot, (U.P.) commissioned by Subhash Chandra Chawla.
  • Environment Impact Assessment (EIA) of Silica Sand mines at Chitrakoot, (U.P.) commissioned by Raghunath Prasad.
  • Environment Impact Assessment (EIA) of mining project at Village: babarjar, District. Jamnagar, Gujrat commissioned by Viya mines & minerals.
  • Environment Impact Assessment (EIA) of sand mining project at Tehsil-Urai, District-Jalaun, U.P. commissioned by Mr. Ramesh Kumar Mishra.
  • Environment Impact Assessment (EIA) of Chine Clay mine at Dist. Bhilwara, Rajasthan commissioned by M/s Tulsi Mines & Minerals.
  • Environment Impact Assessment (EIA) of Stone mine at Rolagutu, Khunti commissioned by Vishal Construction.
  • Environment Impact Assessment (EIA) of Sand mining projects at Dist. Hamirpur, U.P. commissioned by Smt. Geeta Singh.
  • Environment Impact Assessment (EIA) of Limestone mine at Village Paroliya, Tehsil Jhalrapatan, District- Jhalawar, Rajasthan commissioned by Sh. Rahul Jain.
  • Environment Impact Assessment (EIA) of Kalali & Kalyana mines at Tehsil Dadri, Dist Bhiwani, Haryana commissioned by Associated Soapstone Distributing Co. Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Sand mine at Bhati Majra, District Shamli (U.P) commissioned by Sh. Sanjeev Kumar.
  • Environment Impact Assessment (EIA) of River Bed mining project at Tehsil Mangral, Kishangarh, Dist. Bare, Rajasthan commissioned by M/s M.L. Marmath.
  • Environment Impact Assessment (EIA) of  Granite M.L. 17/13 at Village Sakadara, Dist. Pali, Rajasthan commissioned by M/s Uddhav Granite Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Leather Cluster Project at Industrial Area, Unnao, UP commissioned by Meena Steels Ltd.
  • Environment Impact Assessment (EIA) of Masonary Stone Mine at Village Bapcha, Tehsil Chhabra, Dist. Baran, Rajasthan commissioned by M/s Shree Grits & Building Material Supplier.
  • Environment Impact Assessment (EIA) of mining project at Vill. Jhalo Ki Madar, Dist. Rajsamand Rajasthan commissioned by M/s Karnawatt Marbles & Granite Pvt. Ltd.
  • Environment Impact Assessment of sand/Moram  Mine at village Bhenrikharka Khand 23/7     Dist. Hamirpur commissioned by Vinay Kumar Contractor, U.P
  • Environmental Impact Assessment of stone mine at village Pahra Dist. Mahoba commissioned by Shiv Vijay, U.P.
  • Environmental Impact Assessment of stone mine at Dehorra Dist. Mahoba commissioned by A.K Tripathi, U.P
  • Environmental Impact Assessment of stone mine at village Pahora Dist. Mahoba commissioned by Ram Gopal, U.P
  • Environmental Impact Assessment of stone mine at village Kulpahad Dist. Mahoba commissioned by Naimurehaman, U.P
  • Environmental Impact Assessment of stone mine at village Pahra Dist. Mahoba commissioned by Neeraj Kumar, U.P.
  • Environmental Impact Assessment of stone mine at village Pahora Dist. Mahoba commissioned by Suraj Prasad, U.P.
  • Environmental Impact Assessment of stone mine at village Makarbai Dist.Mahoba commissioned by Reita Puwar, U.P
  • Environmental Impact Assessment of Dolostone Mine at village Vardiya Tehsil Robertsganj Dist. Sohanbhadra commissioned by Kamuranchal Stone crushing Corporation, U.P.
  • Environmental Impact Assessment of Janardanpur Limestone mine at Dist. Satna, commissioned by Shri Sankatha Prasad Dwivedi, M.P.
  • Environmental Impact Assessment of stone mine at Basal Distt. Una commissioned by M/s Saraswati Stone Crusher and Screening Unit, H.P.
  • Environmental Impact Assessment of Mining Quary in the name of Hindusthan Industries and Mining Corporation, at Bakudih, Sahibganj commissioned by Hindusthan Industries and Mining Corporation, Jharkhand
  • Environment Impact Assessment of stone mining Project at Kabri Mahoba commissioned by     Shailendra Singh, U.P.
  • Environment Impact Assessment of stone mining Projects at village Pahad, Makarvai   Commissioned by Ms Sangeetha Soni and Rama Soni, U.P
  • Environment Impact Assessment of stone mining Projects at village Pahad, Kabrai Commissioned by Mahendra Singh, U.P
  • Environment Impact Assessment of Stone Mine at village Salani Katola Distt. Sirmour commissioned by Maa Vaishno Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of Stone Mine at Mauza Dhandri V.P.O Takarla, Tehsil Distt Una commissioned by M/s H.S.D Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of stone mining at Mauza and Mauhal Kungrat of tehsil haroli Dist. Una commissioned by M/s Lakhwinder Singh, Himachal Pradesh.
  • Environment Impact Assessment of Quartz mine at Ligri Dist. Katni commissioned by Ligri Quartz mine, M.P
  • Environment Impact Assessment of stone mine at P.O Beolia commissioned by Kapoor Stone Crusher, Shimla, H.P.
  • Environment Impact Assessment of stone mining projct at vill. Sijwaha Dist. Jhansi commissioned by Krishna Stone Product Industries, U.P
  • Environment Impact Assessment (EIA) of Moram Mine at Village Barheta, Dist. Banda, UP commissioned by Mr. Shiraj Dhawaj Singh
  • Environment Impact Assessment (EIA) of Sand Moram Mine at zone-2, khand 16,17, & 18, vill Mahewa, Allahabad (U.P) commissioned by Manju Nishad
  • Environment Impact Assessment (EIA) of Sand Moram Mine at zone 3, khand 22 Mohhabbatganj, Dist Allahabad (U.P) commissioned by Surender Kumar
  • Environment Impact Assessment (EIA) of Sand Moram Mine at zone 1 khand no 1, Vill. Daulatpur, Kachhar, Dist. Ramabai Nagar (U.P) commissioned by Inder singh
  • Environment Impact Assessment (EIA) of Sand moram mine at Zone 1, Bhukhand no 19, Vill. Pailani, Banda (U.P) commissioned by Manoj Tiwari,
  • Environment Impact Assessment (EIA) of Sand Moram Mine at Zone 1 Bhukhand No 10, Vill. Naseni, Tehsil Naraini, Banda (U.P) commissioned by Dilip Singh
  • Environment Impact Assessment (EIA) of Sand moram mine at Zone 1, Bhukhand no 12, Vill. Khaptiha, Banda (U.P) cpmmissioned by Manoj Tiwari, 
  • Environment Impact Assessment (EIA) of Sand moram mine at village Behemi, Taluka Sikandra, Ramabai Nagar (U.P) commissioned by Alok Kr Sukla, 
  • Environment Impact Assessment (EIA) of Sand Moram Mine at Zone 1 Bhukhand No 8, Vill. Lahureta, Tehsil Naraini, Banda(U.P) commissioned by Dilip Singh
  • Environment Impact Assessment (EIA) of Sand Mine near Pakari ghat sadak marg se Mathura Chapar tak at Distt. Deoria(U.P) commissioned by Bechan Prasad Nishad,
  • Environment Impact Assessment (EIA) of Pardawan Silica Sand Mine at Pardawan, Chitrakoot (UP) commissioned by Rai Bharat Das & Brothers (RDDB), 
  • Environment Impact Assessment (EIA) of EC for Moram Mines at village Tehsil: Haata, Dist. Kushinagar (UP)
  • Environment Impact Assessment (EIA) of EC for Moram Mines at village Aktthai & Matiyar, Dist.- Kushinagar U.P
  • Environment Impact Assessment (EIA) of Sand Mine at Plot O-4, Village Oti Tehsil & Dist Fatehpur (UP) commissioned by Anil Kumar Gupta
  • Environment Impact Assessment (EIA) of Sand Mine at Plot Village Pahariya Khurd Dist Banda (UP) commissioned by Ram Swayambar Mishra
  • Environment Impact Assessment (EIA) of Sand Mine at Plot O-3, Village Oti Tehsil & Dist Fatehpur (UP) commissioned by Shiv Sharan Singh
  • Environment Impact Assessment (EIA) of Sand Mine at Zone 13, Khand 18, Thana Pachim Sharia, Distt Kaushambi, UP,commissioned by  Khem Raj Singh
  • Environment Impact Assessment (EIA) of Bhiswa Urf Kotiyan Sand Mine at Dist Maharajganj UP commissioned by Raj Bahadur Yadav
  • Environment Impact Assessment (EIA) of EC for Sand Mine Khand 2, Adhwal, Dist fatehpur UP, commissioned by Surat Nisad
  • Environment Impact Assessment (EIA) of river bed mining at Lohkat Sand Mine, Zone 12, Khand 15, 30 Acres, Kaushambi UP
  • Environment Impact Assessment (EIA) of river bed mining at Chhikwa Sand Mine, Zone 11, Khand 31, 30 Acres, Kaushambi UP
  • Environment Impact Assessment (EIA) of river bed mining at Lohkat Sand Mine, Zone 12, Khand 13, 30 Acres, Kaushambi UP
  • Environment Impact Assessment (EIA) of river bed mining at Chhikwa Sand Mine, Zone 11, Khand 29, 30 Acres, Kaushambi UP
  • Environment Impact Assessment (EIA) of, Bhaisaha, Chakdainya, Simra & Jhumuwa Sand Mine , Kushinagar U.P commissioned  by Mahesh Saini
  • Environment Impact Assessment (EIA) of Laxmipur Urf Kurmipati Raygang Tak Aurtath Madarbindwaliya Tak Sand Mine, Kushinagar(U.P) commissioned by Ambika Nishad,
  • Environment Impact Assessment (EIA) of Sand/Moram Mine at village Ragarganj, The Hatta, Kushinagar (U.P) commissioned by Mr. Shivpujan,
  • Environment Impact Assessment (EIA) of Sand/Moram Mine at Ranipur Adi nau Gaon Pakariyaar Bishunpur, Maharajganj (U.P) commissioned by Mr.Suresh,
  • Environment Impact Assessment (EIA) of Sand/Moram Mine at Ranipur Adi nau Gaon Tedwa, Maharajganj (U.P) commissioned by Ashok Kumar Tiwari,
  • Environment Impact Assessment (EIA) of Sand Moram Mine at village Sahabganj to Semara, tehsil - Hata, Kushinagar (U.P) commissioned by Sadri Nishad,
  • Environment Impact Assessment (EIA) of Sand Moram Mine at village Basaiya , tehsil - Hata, Kushinagar (U.P) commissioned by Sadri Nishad, 
  • Environment Impact Assessment (EIA) of Stone Ballast/Khandas Mining at village Kohdar, Tehsil Meza, Allahabad (U.P) commissioned by Heman Das Gavri,
  • Environment Impact Assessment (EIA) of Hatimpur sand moram mine , tehsil - deoria, UP commissioned by Sharda Yadav,
  • Environment Impact Assessment (EIA) of Sand Moram Mine, Khand 25/21, Ichhora Jitkari, Tehsil Sarila, Dist. Hamirpur (UP) 
  • Environment Impact Assessment (EIA) of sand mine khand no khand no 7/2 naithi Hamipur U.P commissioned by Sh .Ramesh Chandmishra 
  • Environment Impact Assessment (EIA) of sand mine at khand/gatta no 1,2,3  vill jitarki dariya tehsil sarila hamirpur (U.P) commissioned by Ramesh kumar Mishra
  • Environment Impact Assessment (EIA) of sand mine at khand no. 25/22 ichora jitkari sarila hamirpur (U.P) commissioned by Mrs Maya dixit
  • Environment Impact Assessment (EIA) of sand mine khand no 7 village islampur tehsil sarila & Hamirpur (U.P) commissioned by Shri. Vinod Kumar
  • Environment Impact Assessment (EIA) of sand mine at khand 26/8 chandwari dhuroli tehsil sarila  hamirpur(U.P) commissioned by Ramesh kumar Mishra 
  • Environment Impact Assessment (EIA) of khand no. 25/9 ichora jitkari sarila Hamirpur (U.P)commissioned by Suresh Kumar Mishra ,
  • Environment Impact Assessment (EIA) of sand mine at khand 26/7 chandwari dhurooli district  Hamirpur (U.P) commissioned by Dinesh kumar Mishra 
  • Environment Impact Assessment (EIA) of khand no. 25/2 Ichora jitkari tehsil sarila & Hamirpur commissioned by  Mrs.Malti Mishra 
  • Environment Impact Assessment (EIA) of sand mine at for khand 18/19 sahurapur Hamirpur (U.P) commissioned by Smt Phoolkali ,
  • Environment Impact Assessment (EIA) of sand mine at bandholi kahnd 1  District  Hamirpur (U.P) commissioned by Dinesh kumar Mishra
  • Environment Impact Assessment (EIA) of sand mine khand no 25/11 ichora jitkari tehsil sarila & Hamirpur (U.P) commissioned by Shri Suresh kumar Mishra 
  • Environment Impact Assessment (EIA) of for khand 20/7 vill tikapur tehsil mauda dist Hamirpur (U.P) commissioned by Mr. Suresh kumar Mishra 
  • Environment Impact Assessment (EIA) of Khand 26/6 chandwari dhuroli tehsil sarila  Dist Hamirpur (U.P) Mr. Suresh Kumar Mishra ,
  • Environment Impact Assessment (EIA) of sand mine at khand 20/4 vill  tikapur tehsil mauda district hamirpur (U.P) commissioned by Shri Ramesh Chandmishra 
  • Environment Impact Assessment (EIA) of khand no 3, jigni Tehsil Rath   Dist Hamirpur (U.P) commissioned by Mr. Suresh kumar Mishra 
  • Environment Impact Assessment (EIA) of sand mine at for khand 6/1 vill naithi tehsil district Hamirpur (U.P) commissioned by Mr. Dev Narayan Dixit 
  • Environment Impact Assessment (EIA) of sand mine at for khand 6/4 vill naithi tehsil and district hamirpur(U.P) commissioned by Mr Dev Narayan Dixit
  • Environment Impact Assessment (EIA) of sand mine at khand no 23/12 tehsil sarila Bangali mohala,muhalla ramedi hamirpur(U.P)
  • Environment Impact Assessment (EIA) of Hathi darwaja ,hamirpur EC for sand mine at for khand 7/1 tehsil & district hamirpur(U.P) commissioned by Shri .Rajesh Sharma
  • Environment Impact Assessment (EIA) of sand mine at khand no.9/4 kandor tehsil & district hamirpur(U.P) commissioned by .Mohammad Yusuf Usmani 
  • Environment Impact Assessment (EIA) of sand mine at khand no 2, jigni tehsil rath,hamirpur (U.P) commissioned by Mr.Suresh kumar Mishra 
  • Environment Impact Assessment (EIA) of sand mine at khand no.30/10 bhusli khadar ,tehsil mauda (U.P) commissioned by Shri.Sushil Kumar Betwa ghat ,
  • Environment Impact Assessment (EIA) of sand mine at khand 8/2 nethi rakba ,tehsil Hamirpur (U.P) commissioned by  Mrs. Maya Dixit 
  • Environment Impact Assessment (EIA) of Sand Mine at Sonbhadra (UP) commissioned by Ved Prakash Yadav, 
  • Environment Impact Assessment (EIA) of sand mine at Sonbhadra (UP) commissioned by Mr. Vijay Kumar Mishra.
  • Environment Impact Assessment (EIA) of River Bed Mining at Village Katri Parsola and Chibramau Area, Hardoi, (UP) commissioned by Mr. Rakesh and Mr. Parvin Kumar Sinha.
  • Environment Impact Assessment (EIA) of Kharka Kishanpur Sand Mines at village kharka, Tehsil Bhoganipur, Ramabhai Nagar(UP) commissioned by Mr. K M Gupta
  • Environment Impact Assessment (EIA) of Sand/ Moram Mine at Village Rajhopur, Tehsil Baberu, Banda(UP) commissioned by Mr. K M Gupta
  • Environment Impact Assessment (EIA) of Moram Mine at Village Ram Nagar Kauhan Tehsil and District Fatehpur(UP) commissioned by Mr. Wasim Zama Khan and Mr. K M Gupta.
  • Environment Impact Assessment (EIA) of Sand Mine at Village Devisinghpura, Luhargaon (UP) commissioned by Mr. Virender Kumar Rai.
  • Environment Impact Assessment (EIA) of sand moram mine at Zone number 6, Allahabad (UP) commissioned by Smt. Kusum Kali.
  • Environment Impact Assessment (EIA) of River bed Mines Project at Vill. Chaunki tehsil-Bhattapar Rani, Deoria (U.P.) commissioned by Mr. Ajay Vishkarma.
  • Environment Impact Assessment (EIA) of River bed Mines Project at Vill. Gokulpur, Taluka Diwayee, Bulandshahar, (U.P.) commissioned by Mr. Praveen Sinha.
  • Environment Impact Assessment (EIA) of sand mine at Daulatpur (U.P.) commissioned by Smt Rekha Devi.
  • Environment Impact Assessment (EIA) of sand mine at Bichhawali Kachhar (U.P.) commissioned by Mr. Anil Katiyar.
  • Environment Impact Assessment (EIA) of sand mine at Mokalpur, Varansi (U.P.) commissioned by Mr. Kalpnath Singh.
  • Environment Impact Assessment (EIA) of sand mine at Tehsil Hasanpur (U.P.) commissioned by Smt Sangita Singh.
  • Environment Impact Assessment (EIA) of moram mine at 4/1, Gimuha, Hamirpur (U.P.) commissioned by Mr. Dushyant singh.
  • Environment Impact Assessment (EIA) of moram mine at 10/1, Beri, Hamirpur (U.P.) commissioned by Mr. Prakash Chandra, Dushyant Singh.
  • Environment Impact Assessment (EIA) of moram mine at plot no. K-5, Village korra Kanak, Fatehpur, (U.P.) commissioned by Mr. Shiv Singh.
  • Environment Impact Assessment (EIA) of moram mine at plot no. GU-3, Village Gurwal, tehsil-Khaga, Fatehpur, (U.P.) commissioned by Mr. Shukraj.
  • Environment Impact Assessment (EIA) of moram mine at plot no. K-4, Village korra Kanak, Fatehpur, (U.P.) commissioned by Mr. Sahiruddin.
  • Environment Impact Assessment (EIA) of moram mine at 22/6, Riruwa Basaria, Hamirpur (U.P.) commissioned by Dushyant Singh, Balwant Singh & Prakash  Chandra.
  • Environment Impact Assessment (EIA) of sand moram mine at tehsil-Deoria (U.P.) commissioned by Phulbadan Nishad.
  • Environment Impact Assessment (EIA) of Ahierolly & Shirvaneiya sand moram mine at tehsil-Deoria (U.P.) commissioned by Phulbadan Nishad.
  • Environment Impact Assessment (EIA) of moram mine at plot no. 18/3, village-Sahupur, Hamirpur (U.P.) commissioned by Mr. Anil Kr Gupta.
  • Environment Impact Assessment (EIA) of sand moram mine at village Sahurapur, Hamirpur, (U.P.) commissioned by Mr. Manoj Tiwari.
  • Environment Impact Assessment (EIA) of moram mine at plot no. plot no. 10/33, village Beri, Distt-Hamirpur (U.P.) commissioned by Mr. Rakesh Kr aggarwal & Rahul Singh.
  • Environment Impact Assessment (EIA) of moram mine at village Kharwanch, Jhansi, (U.P.) commissioned by Mr. Devesh Kr Singh.
  • Environment Impact Assessment (EIA) of moram mine at village- Simariva, Jalon, (U.P.) commissioned by Mr. D.K. Singh, Khus Dhawaj Singh, Basant Chaturvedi, Gaurav Som Sharma.
  • Environment Impact Assessment (EIA) of moram mine at village- gajraura, Jalon, (U.P.) commissioned by Mr. D.K. Singh, Khus Dhawaj Singh, Basant Chaturvedi, Somnath Sharma.
  • Environment Impact Assessment (EIA) of sand moram mine at village- Shadi Madanpur, Banda, (U.P.) commissioned by Mr. Daljit Singh.
  • Environment Impact Assessment (EIA) of sand moram mine at village- Gaur Shivpur, Banda, (U.P.) commissioned by Mr. Anil Kr Gupta.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 13, Village Risoda,Banda, (U.P.) commissioned by Mr. Virender Singh.
  • Environment Impact Assessment (EIA) of moram mine at village-Erach, Dist-Jhansi, (U.P.) commissioned by Mhd. Rafiq.
  • Environment Impact Assessment (EIA) of moram mine at Khand No. 5, Village Erach, Dist-Jhansi, (U.P.) commissioned by Rahul Singh.
  • Environment Impact Assessment (EIA) of moram mine at plot no. 12, Village Rameri, Dist-Hamirpur, (U.P.) Mr. Dilip Singh & Wasif Zama Khan.
  • Environment Impact Assessment (EIA) of moram mine at plot no. 19/3, Village Tikkapur, Hamirpur, (U.P.) commissioned by Mr. Munnilal Aggarwal, Vijay Singh, Rakesh Kr Aggarwal & Rafiq Ahmed.
  • Environment Impact Assessment (EIA) of River bed mining project at Kachla Kham Khand-I, Badaun (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Village Belbhatia, Balrampur (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Village Andhar Purva II, Balrampur (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Gauripur, Bagpat (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Netuva, Unnao (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Katri Paparkheda, Unnao (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Sukhela, badaun (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Pachayra, GZBD (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Village Kherenia I, Balrampur (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Village Kherenia II, Balrampur (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of River bed mining project at Village Kherenia III, Balrampur (U.P.) commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment (EIA) of sand moram mine at Subhanpur Bangar, Baghpat (U.P.) commissioned by M/s Charan Singh Mines.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 5/5, 40 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 8/3, 90 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 9/1, 76 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 22/14, 60 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 18/19, 50 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 5, 50 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 26/5, 9 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 25/20, 90 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 14/2, 40 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 5/1, 50 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 6/3, 90 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment (EIA) of sand moram mine at Khand 4/2, 45 Acre Hamirpur (U.P.) commissioned by M/s Dhawan Constructions.
  • Environment Impact Assessment of mining unit at Pipalijori Pakur commissioned by Master Sunder Das and Sons, Jharkhand
  • Environment Impact Assessment of Mining Unit at Rajbandh Pakur commissioned by   Indra      Kumar, Jharkhand.
  • Environment Impact Assessment of Mining Unit at Khaprajola Pakur commissioned by    OtanDas and Co., Jharkhand.      
  • Environment Impact Assessment of Ara Fireclay mine Distt Latehar Commissioned by M/s Lal Ugratara Nath Shahdeo Jharkhand.
  • Environment Impact Assessment Of sand Moram Mine at Plot no. K-2 Village Korakanak, Dist Fatehpur Commissioned by Mr. Sukhraj Uttar Pradesh.
  • Environment Impact Assessment Of sand mining Project Baghpat Commissioned by AR and Company, Uttar Pradesh.
  • Environment Impact Assessment Of mining unit at Khaprajola Pakur Commissioned by Otan Das and CO., Jharkhand
  • Environment Impact Assessment of Sand Mine at village Earch Tehsil Garotha Distt. Jhansi Commissioned by M/s Meera Yadav U.P.
  • Environmental Impact Assessment (EIA) of stone crusher plant at village Bairiyan, Distt. Una Commissioned by M/s Thakur Enterprises, Himachal Pradesh
  • Environmental Impact Assessment (EIA) of stone crusher plant at village Bairiyan, Distt. Una Commissioned by M/s Thakur Enterprises, Himachal Pradesh
  • Environment Impact Assessment Gidurha Laterite & Iron Ore Deposit at Distt-Jabalpur, commissioned by Broken Hill Mining Company M.P.
  • Environment Impact Assessment of sand mining project at tehsil-Khomar,Soharatgarh Distt-Siddharth Nagar commissioned by Mr. Krishna Kumar Jaiswal, U.P
  • Environment Impact Assessment of sand mining project at Barohia Khalsa Tehsil- Naugarh, Distt- Siddharth Nagar commissioned by Mr. Krishna Kumar Jaiswal, U.P
  • Environment Impact Assessment of Bhatia kala Limestone mine at Bathia Kala tehsil-Raghuraj Nagar commissioned by Shri Ramanand Shukla, M.P.
  • Environment Impact Assessment of Lalpur Limestone mine at village lalpur tehsil-Raghuraj Nagar Distt-Satna commissioned by Shri Kamlendra Singh, M.P.
  • Environment Impact Assessment of Garhari Diaspore Pyrophylite mine at Garhari commissioned by Sahaj Sahyog Consultants Pvt. Ltd. Jhansi,U.P
  • Environment Impact Assessment of Mailar Shivpura Diaspore Pyrophyllite Mine at Mailar Shivpura, Lalitpur commissioned by Sahaj Sahyog Consultants Pvt. Ltd, M.P.
  • Environment Impact Assessment of Bathia Kala Limestone mine at Bathia Kala Tehsil Raghuraj Nagar, village Lalpur commissioned by Shri Kamlendra Singh, M.P.
  • Environment Impact Assessment of Hadsbadpur Limestone mine at village Hadbadpur, tehsil Rajhuraj nagar commissioned by Shri Ramanand Shukla, M.P
  • Environment Impact Assessment of Bicchia Laterite & fire clay at village Bichhiya, Distt.- Katni commissioned by Mr. kiran Bhaseen, M.P
  • Environment Impact Assessment of Bicchia Laterite & fire clay at village Bichhiya, Distt.- Katni commissioned by Mr. Prakash Sondhiya, M.P
  • Environment Impact Assessment of Karigohi Laterite & Bauxite at village- Karigohi, tehsil-Majhgawan, Distt Satna commissioned by Shri Rajendra kumar Agrawal, M.P
  • Environment Impact Assessment of Barui Bauxite, Ochre, White Clay & Laterite, at village- Barui, Tehsil-Birsinghpur, Dist Satna commissioned by M/sKunjilal Ishwari Prasad, M.P.
  • Environment Impact Assessment of Barui Bauxite and laterite mine at Barui and karigohi commissioned by Mr. R.C agrawal, M.P
  • Environment Impact Assessment of Badera-kala ochre & laterite mine at Jaitwara Dist Satna commissioned by M/s Heeralal Sundarlal Agrawal, M.P.
  • Environment Impact Assessment of Kuchmaila Kothar Laterite Ochres & white clay mine at Kuchmaila commissioned by M/s Smt. Nirmala Devi Khemka, M.P
  • Environmental Impact Assessment (EIA) of langratand Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Chirodih Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Amtipani Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of langratand Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Amtipani Bauxite Mine at Lohardaga Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Tuimu Bauxite Mine at Lohardaga commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Serka/Serandag Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Kujam Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Pakhar Bauxite Mine and Laterite Mines at Lohardaga commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Jobhipat Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Harup Bauxite Mine at Gumla commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Chirodih Bauxite Mine commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Pryophite and Disapore Mine commissioned by M/s Vinod Kumar Trivedi, Gourhari, Dist.Mahoba (U.P.).
  • Environmental Impact Assessment (EIA) of Bauxite Mine commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand
  • Environmental Impact Assessment (EIA) of Ahierolley & Shirvaneiya sand/moram mine commissioned by FullBadan Nishad, Deoria, UP.
  • Environmental Impact Assessment (EIA) of Hatimpur sand/moram mine commissioned by Sharda Yadav, Deoria, UP.
  • Environmental Impact Assessment (EIA) of Sand Mine commissioned by Mr. Virender Kumar Rai Dist. Jhansi, UP.
  • Environmental Impact Assessment of sand mine at village Bhurendi, Kanwara, Chilehata Dist. Banda Commissioned by Mr. Somesh Bhardwaj, U.P.
  • Environmental Impact Assessment of sand mine at village Amrol Khadar, Dist. Banda Commissioned by Mr. Manoj Kr. Tiwari,U.P
  • Environmental Impact Assessment of sand mine at village Bhurendi, Dhurendi Dist. Banda Commissioned by Mr. Dilip Kr. Singh, U.P.
  • Environmental Impact Assessment of sand mine at village Garautha,Dist. Jhansi Commissioned by Mr. Devesh Kr. Singh, U.P.
  • Environmental Impact Assessment of Moram mine at Plot no. 12,village Rameri,Hamirpur Commissioned by Mr.Dilip Singh and Wasif zama khan,UP.
  • Environmental Impact Assessment of Moram mine at Plot no.19/3, village Tikkapur, Hamirpur Commissioned by Mr. Munnilal Aggarwal, Vijay Singh, Rakesh Kr Aggarwal & Rafiq Ahmed, and U.P.
  • Environmental Impact Assessment of Sand moram Mine at village Barheta, Dist Banda Commissioned by Mr. Shiraj Dhawaj Singh, U.P.
  • Environmental Impact Assessment of Sand Mine at Plot no. 6, Village Pathari, Dist. Banda Commissioned by Mr. Shiv saran Singh, U.P.
  • Environmental Impact Assessment of Moram Mine at Village Erach, Dist Jhansi Commissioned by Mhd. Rafiq.U.P.
  • Environment Impact assessment Of Commercial Project located at Sec-106, commissioned by Spire Developers Pvt. Ltd, Gurgaon.
  • Environment Impact assessment Of Project- Ashoka University at Sonepat commissioned by International Foundation for Research & Education, Haryana.
  • Environment Impact assessment Of Bijri Diaspore Pyrophyllite Mine at Bijri, Lalitpur commissioned by Sahaj Sahyog Consultants Pvt. Ltd, Jhansi
  • Environment Impact assessment Of Pallar, Bawal & Tanda Diaspore Pyrophyllite Mine at Pallar Bawal & Tanda commissioned by Sahaj Sahyog Consultants Pvt. Ltd, Jhansi
  • Environmental Impact Assessment of Moram mine at khand no. 5, village erach, dist Jhansi Commissioned by Mr. Rahul Singh, U.P.
  • Environmental Impact Assessment of Moram mine at village Simariya, Jalon Commissioned by Mr. D K Singh, Khush Dhwaj Singh, Basant Chaturvedi, Gaurav Som Sharma village Simariya, U.P.
  • Environmental Impact Assessment of Moram Mine at Village Gajraura, Dist. Jalon Commissioned by Mr. D K Singh, Khush Dhwaj Singh, Basant Chaturvedi,Somnath Sharma,U.P
  • Environmental Impact Assessment of Sand Moram Mine at village Shadi Madanpur, Dist. Banda Commissioned by Mr. Daljit Singh,U.P
  • Environmental Impact Assessment of sand moram mine at village Gaur Shivpur, Dist. Banda Commissioned by Mr. Anil kr. Gupta, and U.P.
  • Environmental Impact Assessment of sand moram mine at khand 13, village risoda, Dist. Banda Commissioned by Mr. Virender Singh. U.P
  • Environmental Impact Assessment of Moram Mine at plot no. 18/3, village Sahupur, Hamirpur Commissioned by Mr. Anil kr. Gupta.U.P.
  • Environmental Impact Assessment of sand moram mine at village Sahurapur, Dist. Hamirpur Commissioned by Mr. Manoj Tiwari, U.P.
  • Environmental Impact Assessment of Moram Mine at plot no. 10/33. Village Beri, Hamirpur Commissioned by Mr. Rakesh Kumar Aggarwal & Rahul Singh,U.P.
  • Environmental Impact Assessment of Moram Mine at village Kharwanch, Jhansi Commissioned by Mr. Devesh Kumar Singh, U.P.
  • Environmental clearance for the Karnakote Limestone Mine commissioned by Cement Corporation of India, GOI.
  • Environmental clearance for the Karnakote Shale Mine commissioned by Cement Corporation of India, GOI.
  • Environmental clearance for the Karnakote Laterite Mine commissioned by Cement Corporation of India, GOI.
  • Environmental Impact Assessment (EIA) of Bauxite Mine commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand..
  • Environmental Impact Assessment (Air Pollution), carried out at Cement Plant, Akaltara for Cement Corporation of India (CCI), (M.P.), 
  • Environmental Impact Assessment (EIA) of Lipunga Thakura Iron and Manganese Ore Deposit in west Singhbhum commissioned by Balmukund Sponge & Iron Limited, Jharkhand.
  • Environmental Impact Assessment (EIA) of Moram Mine, Village Korra Kanak Fatehpur commissioned by Mr. Shiv Singh, U.P
  • Environmental Impact Assessment (EIA) of Moram Mine, Village Korra Kanak Fatehpur commissioned by Mr. Sahiruddin, U.P
  • Environmental Impact Assessment (EIA) of Moram Mine, Village Gurwal, Tehsil-Khaga Fatehpur commissioned by Mr. SukhRaj, U.P
  • Environmental Impact Assessment (EIA) of Mining Project at Etapalli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Niruki, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental clearance for the Karnakote Limestone Mine commissioned by Cement Corporation of India, GOI.
  • Environmental clearance for the Karnakote Shale Mine commissioned by Cement Corporation of India, GOI.
  • Environmental clearance for the Karnakote Laterite Mine commissioned by Cement Corporation of India, GOI.
  • Environment Impact Assessment (EIA) for stone mining project at Dist. Sahibganj, Jharkhand commissioned by M/s. Yash Raj Black Stone Works.
  • Environment Impact Assessment (EIA) for Dumardih Stone mines at Gumta, Uttar Pradesh commissioned by M/s. Jaglal Prasad.
  • Environment Impact Assessment (EIA) for Banspahari stone mines at Banspahari, Madhupur commissioned by M/s. Paramhans Pandey.
  • Environment Impact Assessment (EIA) for Minor minerals mine at Mohakampur Nawada, Dist. Sirmour (H.P) commissioned by M/s. Vishal Agarwal.
  • Environment Impact Assessment (EIA) for stone mine project at Dist. Allahabad (U.P) commissioned by M/s. Vijay Kumar Aggarwal.
  • Environment Impact Assessment Of Mining Project at Village- Kuthar Beet, Tehsil- Haroli, Distt-Una commissioned by AAR ESS Grits, Himachal Pradesh.
  • Environment Impact Assessment Of stone crusher unit at Vill, Harian, Jawali commissioned by M/s Vipasha stone Crusher, Himachal Pradesh.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Belbhatia, District Belrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environment Impact Assessment of Sand Mining Projects at District. Hamirpur Commissioned by Dinesh kumar Mishra, U.P
  • Environmental Impact Assessment (EIA) of Murli Pahari Limestone Mine Project at Rohtas, Bihar commissioned by Kalyanpur Cement Ltd.
  • Environmental Impact Assessment (EIA) of CSTP Project at Baddi, Himachal Pradesh commissioned by Baddi Infrastructure Limited.
  • Environmental Impact Assessment (EIA) of the river bed mining of village at Gokulpur, Taluka: Diwayee, District: Bulandshar U.P. commissioned by Mr. Vivek.
  • Environmental Impact Assessment (EIA) of The River bed mining of village at chnuki, Tehsil - Bhattapar rani (25 acres) Deoria U.P. commissioned by Mr. Ramakbal Nishad.
  • Environmental Impact Assessment (EIA) of Sand Mine at Sonbhadra, Uttar Pradesh commissioned by Ved Prakash Yadav.
  • Environmental Impact Assessment (EIA) of Moram Mine at Sangolipur Garha, Teh: Khaga District Fatehpur, U.P commissioned by Mr. Daljit Singh.
  • Environmental Impact Assessment (EIA) of Pardawan Silica Mines at Pardawan, Chitrakoot, U.P. commissioned by Rai Bharat Dasa & Brothers.
  • Environmental Impact Assessment (EIA) of Moram Mine at Plot no. K1, Village Kora Kanak Fatehpur, U.P commissioned by Mr. Bahadur Aliyas Ram Bahadur.
  • Environmental Impact Assessment (EIA) of Moram Mine at Plot no. K3, Village Kora Kanak Fatehpur, U.P commissioned by Mr. Ajay Kumar Gupta.
  • Environmental Impact Assessment (EIA) of The Moram Mine at Tehsil: Heeta Distirct: Kushinagar U.P. commissioned by Babu Lal Sahani.
  • Environmental Impact Assessment (EIA) of The Moram mine at Village: Aktthal 7 mattiyam District: Kushinagar (U.P) commissioned by Ram Vilas Nishad.
  • Environmental Impact Assessment (EIA) of Kujam Bauxite Mines Project at Lohardaga commissioned by Gyanchand Prasad Agarwal.
  • Environmental Impact Assessment (EIA) of The River Bed Mining of Village Katra Parsola Chibramau Aera commissioned by Mr. Rakesh.
  • Environmental Impact Assessment (EIA) of Serka & Serangdag Bauxite Mines Project at Lohardaga commissioned by Umesh Prasad Agrawal.
  • Environmental Impact Assessment (EIA) of Soapstone at Chamoli commissioned by Mr. Bipin Singh Rana.
  • Environmental Impact Assessment (EIA) of River bed mining project at Gauripur, Bagpat commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of Kujam Bauxite Mines Project at Lohardaga commissioned by Gyanchand Prasad Agarwal.
  • Environmental Impact Assessment (EIA) of Serka & Serangdag Bauxite Mines Project at Lohardaga commissioned by Umesh Prasad Agrawal.
  • Environmental Impact Assessment (EIA) of River bed mining project at Kachla Kham Khand- I, Badaun commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Netuva, Unnao commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Katri Paparkheda, Unnao commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Sukhela, Badaun commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Pachayra, GZBD commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Kherenia I, District Balrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Kherenia II , District Balrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Kherenia III, District Balrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of Mining at Ghatasher, Naanaul commissioned by M/s Vinod Kumar & Company.
  • Environmental Impact Assessment (EIA) of Rabda Graphite Mine at Palamu commissioned by Tirupati Carbons & Chemicals Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Hydro Electric Power Project at Upper Siang, District, Arunchal Pradesh commissioned by Meenakshi Siang Valley Power Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Municipal Solid Waste Project at Sri Ganga Nagar, Rajasthan commissioned by Hydro Air Tectonics (PCD) Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Himachal Pradesh commissioned by Ashish Kumar & Others
  • Environmental Impact Assessment (EIA) of Virpur Bauxite Mines Area 55.2520 Hect. S.No. 110/P Vill. Virpur, Jamnagar,State- Gujarat commissioned by Pushpaben Prabhudas Makhecha
  • Environmental Impact Assessment (EIA) of Mining Project at Subhanpur Bangar, Baghpat (U.P.) commissioned by M/s Charan Singh Mines
  • Environmental Impact Assessment (EIA) of Minor Mineral at Tons River, Plot-1 Village Haripur commissioned by M/s Doiwala Sahkari Shram Samwida Samiti Limited
  • Environmental Impact Assessment (EIA) of Minor Mineral at Yamuna River, Village Rampur Mandi commissioned by M/s Doiwala Sahkari Shram Samwida Samiti Limited
  • Environmental Impact Assessment (EIA) Thermal power plant project of 6.0 MW Captive Power generations at 7th KM Moradabad Road, Kashipur commissioned by Siddheshwari Paper Udyog Limited
  • Environmental Impact Assessment (EIA) 6.0 MW Turbine for Captive Power generation at 7th KM Moradabad Road , Kashipur commissioned by Siddheshwari Paper Udyog Limited
  • Delhi City Gas Distribution project “Detailed Engineering for pipeline networking in Delhi for Indraprashtha Gas Limited (IGL), Delhi.
  • Environmental Impact Assessment (EIA) of expansion of Mideast Integrated steel Plant (MISL) Project at Jaipur, Orissa commissioned by Mideast Integrated Steels Ltd.
  • Environment Impact Assessment for Bauxite Mine at Jillingsire Commissioned by Pawan kumar Poddar, Jharkhand.
  • Environment Impact Assessment for Bauxite Mine at Narma Commissioned by Ashok Kumar Poddar, Jharkhand.
  • Environmental Impact Assessment (EIA) of River Mining Project at Deriwal, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sidhpur, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Ghandran, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Napwal, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kounterpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahgar, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jandwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mamoon, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kathlore, Dist.-  Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gurah, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Merra, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bherian, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jhumber, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Karkhara, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gunia, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak chimna, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhaki Sharda, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Karoli, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jandroi, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dadwan, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Garota khurd, Dist. - Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Makeem Pur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gho, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Samrala, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sahidpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Papial, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Khanpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Garota Kalan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Siunti, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Shehar, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at jaswan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhan, Dist.-  Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Farida Nagar, Dist.-  Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Daulat Pur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mast Garh, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Manwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gurra kalan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nalunga, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Abad Garh, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Simbli Gujran, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Treti Narang Pur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhadroya, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tara, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhatwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Barsoon, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Galri, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raji Beli, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dulpat, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak Hari Rai, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak Ram Sahai, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Garmar, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tajpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Aner, Dist.-  Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Beli Changa, Dist.-  Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhawle, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Naushera Nalwanda, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nangal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Talwara Jattan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Talwara Gujjran, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kotili Barwala, Dist.- Amritsar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chaharpur, Dist.- Amritsar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Wazir Bhullar, Dist.- Amritsar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhalojala, Dist.- Tarn-Taran commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gagrewal, Dist.- Tarn-Taran commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sherpur Bahtian, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dagana Khurd, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Taggar Kalan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nasrala, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahaderpur, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Khalvana, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Deowal, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Powal, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Fategarh Niara, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak Gujran, Dist.-  Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Saidu Patti, Dist.-  Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sukhiabad, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Harta, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Badla, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mukhliana, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hargarh, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bassi Gulam Hussain, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dadiana Kalan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Patti, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bohan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hardokhanpur, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dagana Kalan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jadujanda, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kaillon, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Shergarh, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dihana, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Zahad Pur Jattan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raipur Gujran, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kadiana, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhagara, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Lassara, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Burj Bussan, Dist.-  Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Phillour, Dist.-  Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sangowal, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhoula, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raipur Arainan, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Manddesal, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mandbutala, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nabi Bakshwala, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mand Dhilwan, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Amritsar, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Faridpur, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Talwandi Kalan, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Balliewal, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhukhri Khurd, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Boont, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chholey, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhanansu, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gorsian Hakam Rai, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hambran, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jodhwal, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kassabad, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kutbewal Araian, Dist.-  Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nurpur Bet, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Parchian Biharipur, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tepla, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Rampur, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Rajgarh, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nanheri, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kapoori, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Samshpur, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Surewal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dyapur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Belaram-garh, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Algran, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Harsabela, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nangli, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sehjowal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mjari, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhallrhi, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nangran, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Niku Nangal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Brahampur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhangal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raipur Sani, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chandpur, Dist.-  Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Agampur, Dist.-  Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Baihara, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Swarha, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Manguwal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Diwarhi, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Majri Sarsa, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Aspur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kakrala, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Haler, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mindwan, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kalyanpur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kiratpur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mughal Majri, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Behrampur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Goslan, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Barhi Haveli, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sotal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Salapur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Balsanda, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Lodhipur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mothapur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Plassi, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhallan, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Malakpur, Dist.- Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Burj Tehaldas, Dist.- Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Saidpur Khurd, Dist.-  Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kanon, Dist.-  Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tirha, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mastgarh, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sohali, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Naglian, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Darrhi, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chaparhchirhi Kalan, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chaparhchirhi Kalan, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tiwana, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sarangpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Alamgir, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dehar, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sundran, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Pandwala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahourhi, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahourha, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Ibrahimpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhankharpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mubarikpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kakrali, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Khairpur, Dist.-  Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Singhpura, Dist.-  Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Fatehgarh, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Granaga, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Ghogakheri, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kansala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahalpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Siamipur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhakoran Khurd, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Wehra, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mukandpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Fategpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chharh-barh, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhagwangpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Salempur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Pragpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chadiala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hansala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jhajon, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of Solid Waste Management Project at Allahabad, U.P. commissioned by AWP Company Pvt. Ltd.
  • Environment Impact Assessment of sand mining project at tehsil-Khomar,Soharatgarh Distt-Siddharth Nagar commissioned by Mr. Krishna Kumar Jaiswal, U.P
  • Environment Impact Assessment of sand mining project at Barohia Khalsa Tehsil- Naugarh, Distt- Siddharth Nagar commissioned by Mr. Krishna Kumar Jaiswal, U.P
  • Environmental Impact Assessment (EIA) of Group Housing Project Empire at Noida commissioned by Amrapali Empire Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Narma Bauxite Mine Project at PO. Jobhipat, PS. Bishunpur, Dist.-  Gumla, Jharkhand commissioned by Madan Mohan Prasad Singh.
  • Environmental Impact Assessment (EIA) of Bagru Bauxite Mine Project at PO. Bagru, PS. Kisko, Dist.- Lohardaga, Jharkhand commissioned by Madan Mohan Prasad Singh.
  • Environmental Impact Assessment (EIA) of Group Housing Project at Noida commissioned by JM Housing Private Limited.
  • Environmental Impact Assessment (EIA) of 200 MW Captive Power Plant & 1MT Steel Plant Project at Billaspur, Dist.- Chhattisgarh commissioned by Rashi Strips Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of 200 MW Captive Power Plant Project at Billaspur, Dist.- Chhattisgarh commissioned by Rashi Strips Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of 350 MW Coal Based Power Plant Project at Masturi, Dist.- Chhattisgarh commissioned by Ozone Steel & Power Ltd.
  • Environmental Impact Assessment (EIA) of Steel Plant Project at Padajanpali commissioned by Jagannath Sponge Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Steel Plant Project at Kuarmunda commissioned by Jagannath Sponge Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Harup Bauxit Mine Project at Lohardaga, Dist.- Jharkhand commissioned by Chandrakant Tulasidas Popat.
  • Environmental Impact Assessment (EIA) of Coal Mine Project, Warora West (North) at Wardha Valley Dist. Chandrapur, Maharastra commissioned by Bhatia International Ltd.
  • Environmental Impact Assessment (EIA) of Costal Thermal Power Project Plant (2 x150 MW) and (2 x 300 MW) at Nellore Dist., Andhra Pradesh commissioned by Meenakshi Energy Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Group Housing project at Sector - 10, Sonepat, Haryana commissioned by Indian Railway Welfare Organisation.
  • Environmental Impact Assessment (EIA) of Group Housing project at Sector - 63, at Gurgaon, Haryana commissioned by DLF New Gurgaon Homes Developers Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Institutional Project at Murthal, Haryana commissioned by D.M Educational & Charitable Trust.
  • Environmental Impact Assessment (EIA) of 12 Mega Watt Biomass Power Project at Village Baghaura, District Patiala, Punjab commissioned by Punjab Biomass Power Ltd.
  • Environmental Impact Assessment (EIA) of 5 off-shore Blocks in West Coast, and 7 Exploratory Well in on-shore Block, at Andhra Pradesh, commissioned by Gujarat State Petroleum Corporation Limited.
  • Environmental Impact Assessment (EIA) for Solid Waste Management Project at Mohatabad, Faridabad, Haryana commissioned by National Buildings Construction Corporation Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Karmpalli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of IIMT Campus Project on Gurgaon-Sohna Commissioned by UMAK Educational Trust.
  • Environmental Impact Assessment (EIA) of Kenedy Bauxite mining project, at commissioned by Bharat Abrasives and Chemical Industries.
  • Environmental Impact Assessment (EIA) for Project “Estate One” at Ludhiana, Punjab commissioned by Eldeco Infrastructure & Properties Ltd
  • Environmental Impact Assessment (EIA) of Thermal Power Project (2000 MW) at Madhya Pradesh, commissioned by Moser Baer India Ltd.
  • Environmental Impact Assessment (EIA) for Dr. Ambedkar International Sport Stadium at Faizabad, commissioned by U.P. Jal Nigam
  • Environmental Impact Assessment (EIA) for Real Estate Project at Nagpur, Maharashtra commissioned by Ramnath Reality Pvt. Ltd
  • Environmental Impact Assessment (EIA) for Solid Waste Management Project site at Allahabad (U.P).
  • Environmental Impact Assessment (EIA) for site selection for the disposal of Municipal Solid Wastes at Agra, Commissioned by Construction & Design Services (Uttar Pradesh Jal Nigam, Govt. Of Uttar Pradesh).
  • Environmental Impact Assessment (EIA) of Township Development at Sector -59 Sohna, District Gurgaon, Haryana commissioned by TATA Housing Development Company Ltd.
  • Environmental Impact Assessment (EIA) for Solid Waste Management Project at Rohtak commissioned by National Buildings Construction Corporation Ltd.
  • Environmental  Impact  Assessment  (EIA)  of  “SEZ” Project at  Sector  102, Kherakimajra Gurgaon, Haryana commissioned by Gracious Buildcon Pvt. Ltd.(A subsidiary of BPTP)
  • Environmental Impact Assessment (EIA) for Thermal Project 40 MW Capacity at Jaunpur, U.P. commissioned by Abhinav Steels Pvt. Ltd
  • No Objection Certificate (NOC) for MSW Projects at Firozabad, Muzaffarnagar & Kanpur, U.P. commissioned by A2Z Infrastructure Pvt. Ltd
  • Environmental Impact Assessment (EIA) on Development of Municipal Solid Waste Processing & Diosposal Facility at Shishambada, Vikasnagar, Dehradun, Uttarakhand.
  • Environmental Impact Assessment (EIA) for IT Park Project at Greater NOIDA, Uttar Pradesh commissioned by Classic Diamond Trademart (P) Ltd.
  • Environmental Impact Assessment (EIA) of Breweries project at Village Bhondsi, commissioned by SS Breweries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Batala, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Nawashaher, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Gurdaspur, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Ajnala, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Gadchor, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Township Project at Bhatinda, Punjab commissioned by HPCL & Mittal Energy Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Gallol, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment for Real Estate Project at Nagpur, Maharashtra commissioned by Ramnath Reality Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Group Housing project at Sector -109, at village Babupur, Gurgaon, Haryana commissioned by Chintels India Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Shawad, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environment Impact Assessment for Commercial Cum Residential Project at Guwahati Commissioned by Assam Investment & Construction Co., Assam.
  • Environmental Impact Assessment (EIA) of I.T. Park Project at Sector 59, f, Haryana commissioned by Nova Realtors Pvt. Ltd. (A subsidiary of M3M Group)
  • Environmental Impact Assessment (EIA) of Commercial Complex Project at Sector 59, Gurgaon, Haryana commissioned by Nova Realtors Pvt. Ltd. (A subsidiary of M3M Group)
  • Environmental Impact Assessment (EIA) of Mining Project at Tamboli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment for Group Housing Project at Vill: Shivmadka, Teh: Hingna, Dist. Nagpur, Maharashtra commissioned by Ramnath Reality Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Group Housing Project “Amrapali Saffire” at Sector - 45, NOIDA, U.P commissioned by Amrapali Group.
  • Environmental Impact Assessment (EIA) of Mining Project at Talluka, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Talluka 1, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Group Housing project at Sector -108, at Village Babupur, Gurgaon, Haryana commissioned by Chintels India Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Kanaolli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Soapstone Mine Project at Village Kidai/Khwasi, Dist.- Bageswar, Uttarakhand commissioned by New Hills Mines and Minerals.
  • Environmental Impact Assessment (EIA) of School Project at Dehradun, Uttarakhand commissioned by Maha Seer Education Private Limited.
  • Environmental Impact Assessment (EIA) of Pakhar Bauxite Mine Project at Lohardaga, Jharkhand commissioned by Gandharva Oran.
  • Environmental Impact Assessment (EIA) of Jobhipat Bauxite Mine Project at Gumla, Jharkhand commissioned by M/s O.P. Gupta Mine Owner.
  • Environmental Impact Assessment (EIA) of Chanpi Bauxite Mine Project at Lohardaga , Jharkhand commissioned by M/s Arbind Kumar Singh Mine Owner.
  • Environmental Impact Assessment (EIA) of Lipunga Thakura Iron & Manganese Ore Project at West Singhbhum, Jharkhand commissioned by Balmukund Sponge & Iron Ltd.
  • Environmental Impact Assessment for a Mining Project at Chattisgarh commissioned by S.J. Mineral Resources
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-2, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-3, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Jakhan-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Jakhan-2, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Chandanav-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nandhor, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nandhor Kailash, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Gaula, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Kosi, Nainital, commissioned by Uttranchal Forest Development Corporation
  • Environmental Impact Assessment (EIA) of Mining Project at Dabka, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nihal, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Sharda, Champawat, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Kiroranala, Champawat, commissioned by Uttranchal Forest Development Corporation..
  • Environmental Impact Assessment (EIA) for the Karivane bauxite Mine at Karivane Village, Shriwardhan Taluk, District: Raigad, Maharashtra. Commissioned by Alatge Stone Crushing Industries. (A subsidiary of Ashapura Minechem Ltd.)
  • Environmental Impact Assessment (EIA) for the Sakhri Bauxite Mine at Sakhari Village, Tah: Mandangad, District:Ratnagiri, Maharashtra. Commissioned by Ashapura Minechem Ltd. Clean Development Mechanism (CDM) at Rohtak & Shahabad Sugar Mills. Commissioned by Haryana State Federation of Co-operative Sugar Mills Ltd.
  • oduct Pipeline (2004) sponsored by HPCL.
  • Air Quality Modelling Study of Sukinda Chromite Mines, Orissa (2004) sponsored by Tata Steel.
  • EIA of Dredging Works in the English Channel, Port Louis Harbour, Mauritius (2004) commissioned by Mauritius Ports Authority, Mauritius.
  • Air Quality Modelling Study for Smelter Plant Extension of Bamnipal, Orissa (2004) sponsored by TISCO.
  • Environmental Impact Assessment (EIA) of Residental Project at Sector – 45, Noida commissioned by SDS Pvt. Limited.
  • Air Quality Modelling Study of Lanjiberna Limestone Mines Project, Orissa (2004) sponsored by Orissa Cement Corporation (OCC).
  • EIA Study of Lucknow - Sitapur 4 Lane Road of NH-24 in the State of Uttar Pradesh (2003) commissioned by Client: National Highway Authority of India.
  • EIA of Damanganga-Pinjal link Tunnel Project (2003) commissioned by Client: National Water Development Agency, Bangalore.
  • Rehabilitation Action Plan (RAP) for Planning and Designing of The New Capital City of Chhattisgarh (2003) commissioned by Capital Area Development Authority, Raipur.
  • Development of Minimal national Standards for rubber Products Manufacturing Industries commissioned by Central Pollution Control Board, Delhi.
  • EIA of Krishna (Almatti)–Pennar Link Canal Project (2003) commissioned by National Water Development Agency, Bangalore, India.
  • EIA for 30 MW Coal Based Captive Power Plant, Khadagprasad, Dhenkanal, Orissa (2001), Client: Nava Bharat Ferro Alloys Ltd, Dhenkanal, Orissa.
  • EIA of Paradip Port Connectivity Project (Chandikhole to Paradip Port) in association with LEA Associates South Asia Pvt. Ltd. (2001), Client: NHAI
  • EIA of NH-5A Road Project connecting Cuttack to Paradip in association with LEA Associates South Asia Pvt. Ltd. (2001), Client: NHAI. 
  • Study of the Impact of distillation on Water Quality of Mandira Jhor (2002), Client: SPCB Environmental monitoring and analysis of Ambient Air Quality for Talcher Super Thermal Power Project, Kaniha (2002), Client: NTPC.
  • Environmental Impact Assessment (EIA) of Pryophite and Disapore Mine Commissioned by M/s Vinod kumar Trivedi,Gourhari,Dist. Mahoba(U.P.)
  • Environmental Impact Assessment (EIA) of Plotted Colony Project, garden city commissioned by DLF Utilities Ltd.
  • Environmental Impact Assessment (EIA) of Group Housing Project, New Town Heights commessioned by DLF New Gurgaon Homes Developers Pvt. Ltd., Gurgaon.
  • Environmental Impact Assessment (EIA) of Bauxite Mine commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Group Housing Project at gurgaon sec-108 commissioned by Gold Developers.
  • Environmental Impact Assessment (EIA) of Commercial Project at Lucknow commissioned by Gold Developers.
  • Environmental Impact Assessment (EIA) of IT Park project commissioned by  Silver Realcon Pvt. Ltd., Gurgaon
  • Environmental Impact Assessment (EIA) of Sand Mine commissioned by Mr. Virender Kumar Rai dist. Jhansi, UP.
  • Environmental Impact Assessment (EIA) of Group Housing Project, Shri Ram Heights commissioned by Rock Fort Developers Pvt. Ltd., Raj Nagar Extension,Ghaziabad.
  • Environmental Impact Assessment (EIA) of steel Plant at Maneri, commissioned by Arfa Steels and Minerals Pvt. Ltd., M.P.
  • Environmental Impact Assessment (EIA) of Commercial Project commissioned by Citra Properties Ltd, India Bulls, Gurgaon.
  • Environmental Impact Assessment (EIA) of Commercial Project commissioned by Mariana infrastructure Limited.India Bulls,Gurgaon.
  • Environmental Impact Assessment (EIA) of Power Project NALCO, commissioned by Odisha
  • Environment Impact Assessment Of Group Housing cum Commercial Project at Bhubaneswar commissioned by Amrapali Group, Odisha.
  • Environmental Impact Assessment (EIA) of township & Area development Project, Ansal Town commissioned by ansal Housing and Construction Ltd. Meerut, U.P. 
  • Environmental monitoring and analysis of Air, Water and Noise for Ferro Alloys Ltd., Bamnipal, Orissa (2001-2002) sponsored by TISCO
  • Environmental monitoring and analysis of Air, Water and Noise for Nilachal Refractories Ltd, Khadagprasad, Dhenkanal (2001-2002).Client: Nilachal Refractories Ltd.
  • Environmental Impact Assessment (EIA) of IT Park Project commissioned by Crown Realtech Pvt. Ltd.Faridabad, U.P.
  • Environmental Impact Assessment (EIA) for Citra Commercial Project at Gurgaon commissioned by India Bulls.
  • Environmental Impact Assessment (EIA) for Group Housing Project at Karnal commissioned by Ultratech Township Developers Pvt. Ltd..
  • Environmental Impact Assessment (EIA) for commercial warehousing project at Sonepat commissioned by Agson Global Pvt Ltd.
  • Environmental Impact Assessment (EIA) of group Housing Project at Sec-168, commissioned by Opulent Infra Developers Pvt Ltd, Noida.
  • Environmental Impact Assessment (EIA) of Group Housing Project Smart City, Noida Extension commissioned by Amrapali Group, Noida.
  • Environmental Impact Assessment (EIA) of Group Housing Project, at GH-01/C 
  • Sec-107 Hear Beat City, Noida commissioned by Amrapali Group.
  • Environmental Impact Assessment (EIA) of Wave City Centre, at Sec-25A/32 commissioned by Wave Infratech, , Noida
  • Environmental Impact Assessment (EIA) of IIMT Campus Project at Gurgaon-Sohna Commissioned by UMAK Educational Trust.
  • Environmental   Impact   Assessment   (EIA)   of   Institutional   Project   at   Murthal,   Haryana commissioned by D.M Educational & Charitable Trust.
  • Environmental   Impact   Assessment   (EIA)   of   Institutional   project   at   Sonepat,   Haryana commissioned by Bhagwan Mahavir Education Foundation
  • Environmental Impact Assessment (EIA) of Masjid Moth Campus of All India Institute Of Medical Sciences, commissioned by HSCC India Limited, New Delhi.
  • Environmental Impact Assessment (EIA) of Solid Waste Management Project at Rohtak, commissioned by National Building Construction Corporation Ltd.
  • Environmental Impact Assessment (EIA) of Residential Project at sec M 1D Manesar, Gurgaon commissioned by AKME Projects Limited.
  • Environmental Impact Assessment (EIA) of I.E. Barwala, Ph-II commissioned by Haryana state    Industrial  And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of I.E.Dharuhera commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT Manesar commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT Rohtak/Ph-II & Ph-III commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of G.C, Bawal, Ph-III & Ph-IV commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT Roz-Ka-Meo (Sohna), commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT, Kharkhoda, commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of I.E, Barhi, Ph-III commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of G.C, Saha commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of 10/15 MW Power Plant 72, at Jawahar Nagar Extn., Bhelupur, Varanasi commissioned by Canter Vyapaar (P) Ltd, U.P
  • Environmental Impact Assessment (EIA) of 6MW Captive Power Generation at Moradabad Road Kashipur commissioned by Siddheshwari Paper, Uttarakhand. 
  • Environmental Impact Assessment (EIA) of Steel Plant, in Ajitgarh, Distt. Sikar, Rajasthan  commissioned by Lubok Industries Pvt. Ltd
  • Environmental Impact Assessment of sand mine at village Bhurendi, Kanwara, Chilehata Dist. Banda Commissioned by Mr. Somesh Bhardwaj, U.P.
  • Environmental Impact Assessment of sand mine at village Amrol Khadar, Dist. Banda Commissioned by Mr. Manoj Kr. Tiwari,U.P
  • Environmental Impact Assessment of sand mine at village Bhurendi, Dhurendi Dist. Banda Commissioned by Mr. Dilip Kr. Singh, U.P.
  • Environmental Impact Assessment of sand mine at village Garautha, Dist. Jhansi Commissioned by Mr. Devesh Kr. Singh, U.P.
  • Environmental Impact Assessment of Moram mine at Plot no. 12, village Rameri, Hamirpur Commissioned by Mr.Dilip Singh and Wasif zama khan, UP.
  • Environmental Impact Assessment of Moram mine at Plot no.19/3, village Tikkapur, Hamirpur Commissioned by Mr. Munnilal Aggarwal, Vijay Singh, Rakesh Kr Aggarwal & Rafiq Ahmed, and U.P.
  • Environmental Impact Assessment of Sand moram Mine at village Barheta, Dist Banda Commissioned by Mr. Shiraj Dhawaj Singh, U.P.
  • Environmental Impact Assessment of Sand Mine at Plot no. 6, Village Pathari, Dist. Banda Commissioned by Mr. Shiv saran Singh, U.P.
  • Environmental Impact Assessment of Moram Mine at Village Erach, Dist Jhansi Commissioned by Mhd. Rafiq.U.P.
  • Environmental Impact Assessment of Moram mineat khand no. 5, village erach, dist Jhansi Commissioned by Mr. Rahul Singh,U.P.
  • Environment Impact Assessment of Garhari Diaspore Pyrophylite mine at Garhari commissioned by Sahaj Sahyog Consultants Pvt. Ltd. Jhansi,M.P
  • Environment Impact Assessment of Mailar Shivpura Diaspore Pyrophyllite Mine at Mailar Shivpura, Lalitpur commissioned by Sahaj Sahyog Consultants Pvt. Ltd, M.P.
  • Environmental Impact Assessment of Moram mine at village Simariya, Jalon Commissioned by Mr. D K Singh, Khush Dhwaj Singh, Basant Chaturvedi, Gaurav Som Sharma village Simariya, U.P.
  • Environmental Impact Assessment of Moram Mine at Village Gajraura, Dist. Jalon Commissioned by Mr. D K Singh, Khush Dhwaj Singh, Basant Chaturvedi,Somnath Sharma,U.P
  • Environmental Impact Assessment of Sand Moram Mine at village Shadi Madanpur, Dist. Banda Commissioned by Mr. Daljit Singh,U.P
  • Environmental Impact Assessment of sand moram mine at village Gaur Shivpur, Dist. Banda Commissioned by Mr. Anil kr. Gupta, U.P.
  • Environmental Impact Assessment of sand moram mine at khand 13, village risoda, Dist. Banda Commissioned by Mr. Virender Singh. U.P
  • Environmental Impact Assessment of Moram Mine at plot no. 18/3, village Sahupur, Hamirpur Commissioned by Mr. Anil kr. Gupta.U.P.
  • Environmental Impact Assessment of sand moram mine at village Sahurapur, Dist. Hamirpur Commissioned by Mr. Manoj Tiwari, U.P.
  • Environmental Impact Assessment of Moram Mine at plot no. 10/33. Village Beri, Hamirpur Commissioned by Mr. Rakesh Kumar Aggarwal & Rahul Singh, U.P.
  • Environmental Impact Assessment of Moram Mine at village Kharwanch, Jhansi Commissioned by Mr. Devesh Kumar Singh, U.P.
  • Environment Impact Assessment of mining unit at Pipalijori Pakur commissioned by Master Sunder Das and Sons, Jharkhand.
  • Environment Impact Assessment of Mining Unit at Khaprajola Pakur commissioned by Otan Das and Co., Jharkhand.
  • Environment Impact Assessment of Mining Unit at Rajbandh Pakur commissioned by Indra Kumar, Jharkhand.
  • Environment Impact Assessment of stone mine at P.O Beolia commissioned by Kapoor Stone Crusher, Shimla, H.P.
  • Environment Impact Assessment of Barhaiya stone mine at Dist. Satna commissioned by Barhaiya Stone Mine, M.P.
  • Environment Impact Assessment of Quartz mine at Ligri Dist. Katni commissioned by Ligri Quartz mine, M.P
  • Environment Impact Assessment (EIA) of Sponge Iron Plant (expansion) at Bokaro Industrial Area, Jharkhand commissioned by Sundaram Steels (P) Ltd.
  • Environment Impact Assessment (EIA) of Sand stone mining at Ambala, Unit-3, Haryana commissioned by Planet Steel Pvt. Ltd.
  • Environment Impact Assessment (EIA) of “Yamuna Nagar Unit-2” at Distt. Yamuna Nagar (Haryana) commissioned by M/s Astin Excavation & Mining Pvt. Ltd.
  • Environment Impact Assessment (EIA) of “Yamuna Nagar Unit-1” at Distt Yamuna Nagar (Haryana) commissioned by M/s AVJ Infrastructure Pvt. Ltd.
  • Environment Impact Assessment (EIA) of “Yamuna Nagar Unit-4” at Distt Yamuna Nagar (Haryana) commissioned by M/s B.D. Mines.
  • Environment Impact Assessment (EIA) of  “Yamuna Nagar Unit-6” at Distt Yamuna Nagar (Haryana) commissioned by M/s Lotus Infrastructure.
  • Environment Impact Assessment (EIA) of “Yamuna Nagar Unit-3” at Distt Yamuna Nagar (Haryana) commissioned by M/s Jaipur Infrastructure Pvt. Ltd.
  • Environment Impact Assessment (EIA) of “Yamuna Nagar Unit-5” at Distt Yamuna Nagar (Haryana) commissioned by M/s Millennium Infra Engineer Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Granite Mine at Siyaisara,Sirohi, Rajasthan  commissioned by M/s Kamla Devi.
  • Environment Impact Assessment (EIA) of Sand Mining Project at Karnal , Haryana commissioned by Shri Rajvir Chauhan.
  • Environment Impact Assessment (EIA) of Sand Mining Project at Karnal Unit-1, Karnal Haryana commissioned by Shri Vipin Gupta.
  • Environment Impact Assessment (EIA) of Sand Mining Project at Karnal Unit-2, Karnal Haryana commissioned by Shri Devender Nagpal.
  • Environment Impact Assessment (EIA) of Stone Mine Project at Village-Sindhora, Dist. Mirjapur, UP commissioned by Shri Rajesh Kumar Tripathi.
  • Environment Impact Assessment (EIA) of Kalali & Kalyana mine in Tehsil Dadri, Dist. Bhiwani, (Haryana) commissioned by Associated Soapstone Distributing Co. Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Silica Sand Mining Project at Village-Sonwal Taluka, Dist. Allahabad commissioned by M/s Lajpat Rai.
  • Environment Impact Assessment (EIA) of  Graphite Mine at Vill Purnadih, Dist. Palamau, Jharkhand commissioned by Geomax Mines & Minerals Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Limestone mine at District- Jhalawar, Rajasthan commissioned by Shri Rahul Jain.
  • Environment Impact Assessment (EIA) of Granite mine at village Sakadara, Rajasthan commissioned by M/s Baghmal Marble Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Limestone Mine at Dist: Jhalawar, Rajasthan commissioned by Shri Pukhraj Jain.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project at Village Begoudi,Dist. Satna, M.P commissioned by Mr. Somendra Singh.
  • Environmental Impact Assessment (EIA) of Limestone Mine project at Dist. Satna ,M.P commissioned by Smt. Urmila Tripathi.
  • Environmental Impact Assessment (EIA) of Malka Granite Mine at Chatarpur,M.P commissioned by Mr. J.P.Singh.
  • Environmental Impact Assessment (EIA) of Bawal Tanda Mine at Dist. Jhansi commissioned by J.K. Minerals. 
  • Environmental Impact Assessment (EIA) of Granite Mine at Village –Katar,Dist. Bhilwara, Rajasthan, commissioned by Waysan Industries.
  • Environmental Impact Assessment (EIA) of Stone Mine project at pahara, Dist. Mahoba, U.P commissioned by Sh. Himmat Singh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mining project at Village-Basaiya ,Dist-Khusinagar,Uttar Pradesh commissioned by Shri Sadri Nisad.
  • Environmental Impact Assessment (EIA) of Mining lease at Dist. Kathua, J&K commissioned by Mohanpal Singh Pannu.
  • Environmental Impact Assessment (EIA) of Sand Mining project at Sonipat, Haryana, commissioned by Sangam Infra Estates Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Quartize Mine Project at Munger, Biharcommissioned by Mr.SajidHussain.
  • Environmental Impact Assessment (EIA) of Bhadokhara, Block-1 at District Nawada, Biharcommissioned by Mr.ManjeetChawala.
  • Environmental Impact Assessment (EIA) of Bhadokhara, Block-2 at District Nawada, Biharcommissioned by Mr.ManjeetChawala.
  • Environmental Impact Assessment (EIA) of Bhadokhara, Block-3 at District Nawada, Biharcommissioned by Mr.ManjeetChawala.
  • Environmental Impact Assessment (EIA) of Bhadokhara, Block-4 at District Nawada, Biharcommissioned by Mr.ManjeetChawala.
  • Environmental Impact Assessment (EIA) of Bhadokhara, Block-5 at District Nawada, Biharcommissioned by Mr.ManjeetChawala.
  • Environmental Impact Assessment (EIA) of Sand Moram mining Project at village Taribulda District Jalaun, U.Pcommissioned by Dr. V.K. Mishra.
  • Environmental Impact Assessment (EIA) of Sand Moram mining Project at SadiMadanpur, Banda, U.Pcommissioned by Mr. K.M. Gupta.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 5 Khand-17, Allahabad, U.Pcommissioned by Mr.Rajan Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 5 Khand-16, Allahabad, U.Pcommissioned by Mr.Ratan Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-21, Allahabad, U.Pcommissioned by Mr.Rajan Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-20, Allahabad, U.Pcommissioned by Mr. Shiv MurtiBhartiya.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 2 Khand-22, Allahabad, U.Pcommissioned by Mr. Anil Kumar Verma.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-19, Allahabad, U.Pcommissioned by Mr.Vinod Kumar.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-18, Allahabad, U.P commissioned by Mr.Manoj Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-16, Allahabad, U.Pcommissioned by Mrs.Meena Devi.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-17, Allahabad, U.P commissioned by Mr.Manoj Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-14, Allahabad, U.P. commissioned by Mr.Vishwanath.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-15, Allahabad, U.P. commissioned by Mr.Santosh Kumar Tripathi.
  • Environmental Impact Assessment (EIA) of of Stone Mining Project at District Gaya, commissioned by Ramaiya Construction Pvt Ltd.
  • Environmental Impact Assessment (EIA) of Limestone Mine MI No. 97/89, at Aroliya village Jhalwar Rajasthan commissioned by Mr. Govind Dhattatre. 
  • Environmental Impact Assessment (EIA) of Limestone Mine MI No. 14/94, at Aroliya village Jhalwar Rajasthan commissioned by Mr. Govind Dhattatre. 
  • Environmental Impact Assessment (EIA) of Limestone Mine MI No. 26/11, at Aroliya village Jhalwar Rajasthan commissioned by Mr. Govind Dhattatre. 
  • Environmental Impact Assessment (EIA) of Rajabera Iron Ore Mining Project commissioned by Mr. Padam Kumar Jain.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-120/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-117/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-22/09 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-332/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-83/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-40/10 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Slate Mining Project at village Mohal Piura Tehsil Chamba, Chamba Himachal Pradesh commissioned by Yogesh Kumar Slate Company.
  • Environmental Impact Assessment (EIA) of Granite Mines, Gata No.. 1370 at Vllage Kulpahar, District Mahoba, Uttar Pradesh commissioned by Mr. A.K. Tripathi.
  • Environmental Impact Assessment (EIA) of Granite Mines, Gata No. 967 at Vllage Kulpahar, District Mahoba, Uttar Pradesh commissioned by Mr. A.K. Tripathi.
  • Environmental Impact Assessment (EIA) of Ganesh Stone Mining Project Quarry liscense no. 67/2012 located at village Rawarda, Tehsil- Begun,District- Chittorgarh, Rajasthan  commissioned by Mr. NS Gahlot.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Bijasana, tehsil Pahadi, District- Bharatpur. M.L. No.-134/09 commissioned by Prithvi Minng Company
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Chinwara, tehsil Pahadi, District- Bharatpur. M.L. No.-474/02 commissioned by Prithvi Construction
  • Environmental Impact Assessment (EIA) of Ganesh Stone Mining Project Quarry liscense no. 67/2012 located at village Rawarda, Tehsil- Begun,District- Chittorgarh, Rajasthan  commissioned by Mr. NS Gahlot.
  • Environmental Impact Assessment (EIA) of Stone Mining Project Quarry liscense no. 1344/98 located at village Rawarda, Tehsil- Begun,District- Chittorgarh, Rajasthan  commissioned by Mr. NS Gahlot.
  • Environmental Impact Assessment (EIA) of Stone Mining Project Quarry liscense no. 1341/98 located at village Rawarda, Tehsil- Begun,District- Chittorgarh, Rajasthan  commissioned by Mr. NS Gahlot.
  • Environmental Impact Assessment (EIA) of Navadra Limestone Mine located at village Navadra, District Devbhumi Dwarka State Gujarat, commissioned by Mr. Vivek Shah.
  • Environmental Impact Assessment (EIA) of Sand Mining Project (19 projects) at Tehsil Godda in Jharkhand commissioned by Mr. Praveen Sinha. 
  • Environmental Impact Assessment (EIA) of Sand Mining Project (13 projects) at Tehsil Bokaro in Jharkhand commissioned by Mr. Praveen Sinha.
  • Environmental Impact Assessment (EIA) of Magnesium Silicate Mine at Jharakhand commissioned by Jagannath Cement Works Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project M.L. 23/07 located at Village-Tukliya, Tehsil-Merta City, District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project M.L. 24/07 located at Village-Tukliya, Tehsil-Merta City, District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar.
  • Environmental Impact Assessment (EIA) of Stone Bolder Mine Project at Plot No. 3 Village-Bakhrija, Narnaul, Mahendragarh, Haryana commissioned by Everrise Advisory Services Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Silica Sand Mining Project, Hiimmatnagar, Gujarat commissioned by Mr. Moin Sayyad.
  • Environmental Impact Assessment (EIA) of 43 B1 Category Mining Project, located in Mahoba commissioned by Mr. A.K. Traipathi.
  • Environmental Impact Assessment (EIA) of 2 B2 Category Mining Project (Kulpahar and Daherra mine), located in Mahoba commissioned by Mr. A.K. Traipathi.
  • Environmental Impact Assessment (EIA) of Gypsum Mining Project at Village: Bagna, Tehsil: Boniyar, District: Baramulla, Jammu & Kashmir commissioned Kohinoor Gypsum.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project M.L. 90/09 located at Village-Basani Narsingh Tehsil-Merta City, District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project M.L. 91/09 located at Village- Basani Narsingh Tehsil-Merta City, District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project M.L. 175/04  located at Village-Baldu, Tehsil- Ladnun,  District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar.
  • Environmental Impact Assessment (EIA) of Stone Limestone Mine Project M.L. 23/06 located at Village-Dhanapa, Tehsil-Merta City, District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar.
  • Environmental Impact Assessment (EIA) of Sand Mine Project located Himmat Nagar, Gujarat commissioned by All India Minerals.
  • Environmental Impact Assessment (EIA) of Sand Mining Clusters in different location of Madhya Pradesh commissioned by All Sujlam Exploration.
  • Environmental Impact Assessment (EIA) of Limestone (Building Stone); ML No. 2/2011, Near Village Aroliya; Districr Jhalaar, State Rajasthan commissioned by Govind Duttatrey.
  • Environmental Impact Assessment (EIA) of Limestone (Building Stone); ML No. 35/2004, Near Village Chechat, Districr Kota, State Rajasthan commissioned by Govind Duttatrey.
  • Environmental Impact Assessment (EIA) of Soapstone Mining Project at Musyoli, Bageshwar, Uttarakhand commissioned by Nitish Singh.
  • Environmental Impact Assessment (EIA) of B2 Soapstone Mining Project, located at Sonipat, Haryana commissioned by Waves Mines Private Limited.
  • Environmental Impact Assessment (EIA) of B2 Soapstone Mining Project, located at Sonipat, Haryana commissioned by Maa Durga Mines & Minerals.
  • Environmental Impact Assessment (EIA) of B2 Soapstone Mining Project, located at Sonipat, Haryana commissioned by Sukali Soap Stone Mines
  • EIA for 30 MW Coal Based Captive Power Plant, Khadagprasad, Dhenkanal, Orissa (2001), Client: Nava Bharat Ferro Alloys Ltd, Dhenkanal, Orissa.
  • Environmental Impact Assessment (EIA) of 350 MW Coal Based Power Plant Project at Masturi, Dist.- Chhattisgarh commissioned by Ozone Steel & Power Ltd.
  • Environmental Impact Assessment (EIA) of Thermal Power Project (2000 MW) at Madhya Pradesh, commissioned by Moser Baer India Ltd.
  • Environmental Impact Assessment (EIA) of 12 Mega Watt Biomass Power Project at Village Baghaura, District Patiala, Punjab commissioned by Punjab Biomass Power Ltd.
  • Environmental Impact Assessment (EIA) of Costal Thermal Power Project Plant (2 x150 MW) and (2 x 300 MW) at Nellore Dist., Andhra Pradesh commissioned by Meenakshi Energy Pvt. Ltd.
  • EIA for 30 MW Coal Based Captive Power Plant, Khadagprasad, Dhenkanal, Orissa (2001), Client: Nava Bharat Ferro Alloys Ltd, Dhenkanal, and Orissa.
  • Environmental Impact Assessment (EIA) of 6MW Captive Power Generation at Moradabad Road Kashipur commissioned by Siddheshwari Paper, Uttarakhand. 
  • Environmental Impact Assessment (EIA) of Hydro Electric Power Project at Upper Siang, District, Arunchal Pradesh commissioned by Meenakshi Siang Valley Power Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of 10/15 MW Power Plant 72, at Jawahar Nagar Extn., Bhelupur, Varanasi commissioned by Canter Vyapaar (P) Ltd, U.P
  • Environmental Impact Assessment (EIA) of Power Project NALCO
  • Study of the Impact of distillation on Water Quality of Mandira Jhor (2002), Client: SPCB Environmental monitoring and analysis of Ambient Air Quality for Talcher Super Thermal Power Project, Kaniha (2002), Client: NTPC.
  • EIA for 30 MW Coal Based Captive Power Plant, Khadagprasad, Dhenkanal, Orissa (2001), Client: Nava Bharat Ferro Alloys Ltd, Dhenkanal, Orissa.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Batala, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Nawashaher, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Gurdaspur, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Co-Generation Power Plant project at Ajnala, Punjab commissioned by Saraya Industries Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Steel Plant, in Ajitgarh, Distt. Sikar, Rajasthan  commissioned by Lubok Industries Pvt. Ltd
  • Environmental Impact Assessment (EIA) of steel Plant at Maneri, commissioned by Arfa Steels and Minerals Pvt. Ltd., M.P.
  • Environmental Impact Assessment (EIA) for Thermal Project 40 MW Capacity at Jaunpur, U.P. commissioned by Abhinav Steels Pvt. Ltd
  • Environmental Impact Assessment (EIA) of 6MW Captive Power Generation at Moradabad Road Kashipur commissioned by Siddheshwari Paper, Uttarakhand. 
  • Environmental Impact Assessment (EIA) of I.E. Barwala, Ph-II commissioned by Haryana state    Industrial  And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of I.E.Dharuhera commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT Manesar commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT Rohtak/Ph-II & Ph-III commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of G.C, Bawal, Ph-III & Ph-IV commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT Roz-Ka-Meo (Sohna), commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of IMT, Kharkhoda, commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of I.E, Barhi, Ph-III commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environmental Impact Assessment (EIA) of G.C, Saha commissioned by Haryana state Industrial And Infrastructure Development Corporation Ltd (HSIIDC).
  • Environment Impact Assessment (EIA) of Soil STP area Khasra no. 613/1, 612 at Vill. Sahada, Dist. Bhilwara, Rajasthan commissioned by Sadbhav Engineering Limited.
  • Environment Impact Assessment (EIA) of Soil STP area Khasra no. 4391 at Vill. Sahada, Dist. Bhilwara, Rajasthan commissioned by Sadbhav Engineering Limited.
  • Environment Impact Assessment (EIA) of Soil STP area Khasra no. 114,116 at Vill. Sahada, Dist. Bhilwara, Rajasthan commissioned by Sadbhav Engineering Limited.
  • Environment Impact Assessment (EIA) of Soil STP area Khasra no. 4380 at Vill. Sahada, Dist. Bhilwara, Rajasthan commissioned by Sadbhav Engineering Limited.
  • Environment Impact Assessment (EIA) of Soil STP area Khasra no. 454 at Vill. Sahada, Dist. Bhilwara, Rajasthan commissioned by Sadbhav Engineering Limited.
  • Environment Impact Assessment (EIA) of Masonary Stone STP area, Khasra no. 877/1264 at Dist. Billwara, Rajasthan commissioned by Sadbhav Engineering Limited.
  • Environment Impact Assessment (EIA) of Masonary Stone STP area,Khasra no. 861 at Dist. Billwara, Rajasthan commissioned by Sadbhav Engineering Limited.
  • Environmental Impact Assessment (EIA) of Soapstone Mining Project at Musyoli, Bageshwar, Uttarakhand commissioned by Nitish Singh.
  • Environmental Impact Assessment (EIA) of Sand Mining Clusters in different location of Madhya Pradesh commissioned by All Sujlam Exploration.
  • Environmental Impact Assessment (EIA) of Silica Sand Mining Project, Hiimmatnagar, Gujarat commissioned by Mr. Moin Sayyad
  • Environmental Impact Assessment (EIA) of 43 B1 Category Mining Project, located in Mahoba commissioned by Mr. A.K. Traipathi
  • Environmental Impact Assessment (EIA) of Sand Mining Project (19 projects) at Tehsil Godda in Jharkhand commissioned by Mr. Praveen Sinha.
  • Environmental Impact Assessment (EIA) of Sand Mining Project (13 projects) at Tehsil Bokaro in Jharkhand commissioned by Mr. Praveen Sinha.
  • Environmental Impact Assessment (EIA) of Stone Mining Project Quarry liscense no. 1341/98 located at village Rawarda, Tehsil- Begun, District- Chittorgarh, Rajasthan commissioned by Mr. NS Gahlot.
  • Environmental Impact Assessment (EIA) of Stone Mining Project Quarry liscense no. 1344/98 located at village Rawarda, Tehsil- Begun, District- Chittorgarh, Rajasthan commissioned by Mr. NS Gahlot.
  • Environmental Impact Assessment (EIA) of Ganesh Stone Mining Project Quarry liscense no. 67/2012 located at village Rawarda, Tehsil- Begun, District- Chittorgarh, Rajasthan commissioned by Mr. NS Gahlot.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Chinwada, tehsil Pahadi, District- Bharatpur. M.L. No.- 454/02 commissioned by Mr. Vaibhav Mehra
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Bijasana, tehsil Pahadi, District- Bharatpur. M.L. No.-134/09 commissioned by Prithvi Minng Company
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Chinwara, tehsil Pahadi, District- Bharatpur. M.L. No.- 474/02 commissioned by Prithvi Construction
  • Environmental Impact Assessment (EIA) of Slate Mining Project at village Mohal Piura Tehsil Chamba, Chamba Himachal Pradesh commissioned by Mr. Yogesh Kumar Slate Company.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-40/10 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-83/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-332/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-22/09 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-117/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at village Kalyanpuri tehsil Kotoutli, District- Jaipur. M.L. No.-120/03 commissioned by Mr. Nimesh Singhvi.
  • Environmental Impact Assessment (EIA) of Rajabera Iron Ore Mining Project commissioned by Mr. Padam Kumar Jain.
  • Environmental Impact Assessment (EIA) of Stone Mining Project at District Gaya, commissioned by Ramaiya Construction Pvt Ltd.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-15, Allahabad, U.P. commissioned by Mr. Santosh Kumar Tripathi.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-14, Allahabad, U.P. commissioned by Mr. Vishwanath.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-17, Allahabad, U.P. commissioned by Mr. Manoj Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-16, Allahabad, U.P. commissioned by Mrs. Meena Devi.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-18, Allahabad, U.P. commissioned by Mr. Manoj Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-19, Allahabad, U.P. commissioned by Mr. Vinod Kumar.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 2 Khand-22, Allahabad, U.P. commissioned by Mr. Anil Kumar Verma.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-20, Allahabad, U.P. commissioned by Mr. Shiv Murti Bhartiya.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 3 Khand-21, Allahabad, U.P. commissioned by Mr. Rajan Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 5 Khand-16, Allahabad, U.P. commissioned by Mr. Ratan Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Yamuna River Sand Mining at zone 5 Khand-17, Allahabad, U.P. commissioned by Mr. Rajan Kumar Nishad.
  • Environmental Impact Assessment (EIA) of Sand Moram mining Project at Sadi Madanpur, Banda, U.P. commissioned by Mr. K.M. Gupta.
  • Environmental Impact Assessment (EIA) of Sand Moram mining Project at village Taribulda District Jalaun, U.P. commissioned by Dr. V.K. Mishra.
  • Environmental Impact Assessment (EIA) of Sand Mining project at Sonipat, Haryana, commissioned by Sangam Infra Estates Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Mining lease at Dist. Kathua, J&K commissioned by Mohanpal Singh Pannu.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mining project at Village-Basaiya, Dist-Khusinagar, Uttar Pradesh commissioned by Shri Sadri Nisad.
  • Environmental Impact Assessment (EIA) of Sand Mining by Mahadev Enclave Pvt. Ltd. at Dist. Nalanda, Bihar.
  • Environmental Impact Assessment (EIA) of Sand Mining by Mahadev Enclave Pvt. Ltd. at Dist. Banka, Bihar.
  • Environment Impact Assessment (EIA) forStone Mining Project by Lakhmani Stone Products at Pakur, Jharkhand.
  • Environment Impact Assessment (EIA) forStone Mining Project by JR Stone Works at Pakur, Jharkhand.
  • Environment Impact Assessment of Kanlin and sand mining project at vill. Rai Bazar, Dist. Sahibganj commissioned by Standard Mercantile Company, Jharkhand.
  • Environment Impact Assessment of stone mining at village Tatehra, P.O Oel, Tehsil Amb, Distt Una Commissioned by M/s Atharv Crusher, H.P.
  • Environmental Impact Assessment of Mining Quary in the name of Hindusthan Industries and Mining Corporation, at Bakudih, Sahibganj commissioned by Hindusthan Industries and Mining Corporation, Jharkhand.
  • Environment Impact Assessment of stone mining at Mauza and Mauhal Kungrat of tehsil haroli Dist. Una commissioned by M/s Lakhwinder Singh, Himachal Pradesh.
  • Environment Impact Assessment of Mining Unit at Khaprajola Pakur commissioned by Otan Das and Co., Jharkhand.
  • Environment Impact Assessment of Mining Unit at Rajbandh Pakur commissioned by Indra Kumar, Jharkhand.
  • Environment Impact Assessment of mining unit at Pipalijori Pakur commissioned by Master Sunder Das and Sons, Jharkhand.
  • Environment Impact Assessment Of sand mining Project Baghpat Commissioned by AR and Company, Uttar Pradesh.
  • Environment Impact Assessment Of mining unit at Khaprajola Pakur Commissioned by Otan Das and CO., Jharkhand
  • Environment Impact Assessment Of sand mining Project Baghpat Commissioned by AR and Company, Uttar Pradesh.
  • Environment Impact Assessment Of mining unit at Khaprajola Pakur Commissioned by Otan Das and CO., Jharkhand
  • Environment Impact Assessment Of Mining Project at Village- Kuthar Beet, Tehsil- Haroli, Distt-Una commissioned by AAR ESS Grits, Himachal Pradesh.
  • Environment Impact assessment Of Sand Mining Project at Barohia Khalsa Tehsil-Naugarh, Distt- Siddharth Nagar Plot No-159 commissioned by Mr. Krishna kumar Jaiswal.
  • Environment Impact Assessment of sand mining project at Barohia Khalsa Tehsil- Naugarh, Distt- Siddharth Nagar commissioned by Mr. Krishna Kumar Jaiswal, U.P.
  • Environment Impact Assessment of sand mining project at tehsil-Khomar,Soharatgarh Distt-Siddharth Nagar commissioned by Mr. Krishna Kumar Jaiswal, U.P.
  • Environment Impact Assessment Gidurha Laterite & Iron Ore Deposit at Distt-Jabalpur, commissioned by Broken Hill Mining Company M.P.
  • Environment Impact Assessment of Sand Mining Projects at District. Hamirpur Commissioned by Dinesh kumar Mishra, U.P.
  • Environmental Impact Assessment (EIA) of Mining Project at Kiroranala, Champawat, commissioned by Uttranchal Forest Development Corporation..
  • Environmental Impact Assessment (EIA) of Mining Project at Sharda, Champawat, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nihal, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Dabka, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Kosi, Nainital, commissioned by Uttranchal Forest Development Corporation
  • Environmental Impact Assessment (EIA) of Mining Project at Gaula, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nandhor Kailash, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Nandhor, Nainital, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Chandanav-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Jakhan-2, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Jakhan-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-3, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-2, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment (EIA) of Mining Project at Saung-1, Dehradun, commissioned by Uttranchal Forest Development Corporation.
  • Environmental Impact Assessment for a Mining Project at Chattisgarh commissioned by S.J. Mineral Resources
  • Environmental Impact Assessment (EIA) of Mining Project at Niruki, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Etapalli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Kanaolli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Talluka 1, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Talluka, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Tamboli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Shawad, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Gallol, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Gadchor, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Mining Project at Chandrapur, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of Kenedy Bauxite mining project, at commissioned by Bharat Abrasives and Chemical Industries.
  • Environmental Impact Assessment (EIA) of Mining Project at Karmpalli, Maharashtra commissioned by Jiwa Mines & Minerals Ltd.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jhajon, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hansala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chadiala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Pragpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Salempur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhagwangpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chharh-barh, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Fategpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mukandpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Wehra, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhakoran Khurd, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Siamipur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahalpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kansala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Ghogakheri, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Granaga, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Fatehgarh, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Singhpura, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Khairpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kakrali, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mubarikpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhankharpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Ibrahimpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahourha, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahourhi, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Pandwala, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sundran, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dehar, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Alamgir, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sarangpur, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tiwana, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chaparhchirhi Kalan, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chaparhchirhi Kalan, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Darrhi, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Naglian, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sohali, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mastgarh, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tirha, Dist.- Sahib Zada Ajit Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kanon, Dist.- Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Saidpur Khurd, Dist.- Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Burj Tehaldas, Dist.- Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Malakpur, Dist.- Sahid Bhagat Singh Nagar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhallan, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Plassi, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mothapur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Lodhipur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Balsanda, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Salapur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sotal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Barhi Haveli, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Goslan, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Behrampur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mughal Majri, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kiratpur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kalyanpur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mindwan, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Haler, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kakrala, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Aspur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Majri Sarsa, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Diwarhi, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Manguwal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Swarha, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Baihara, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Agampur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chandpur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raipur Sani, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhangal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Brahampur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Niku Nangal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nangran, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhallrhi, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mjari, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sehjowal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nangli, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Harsabela, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Algran, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Belaram-garh, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dyapur, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Surewal, Dist.- Ropar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Samshpur, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kapoori, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nanheri, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Rajgarh, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Rampur, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tepla, Dist.- Patiala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Parchian Biharipur, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nurpur Bet, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kutbewal Araian, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kassabad, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jodhwal, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hambran, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gorsian Hakam Rai, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhanansu, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chholey, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Boont, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhukhri Khurd, Dist.-Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Balliewal, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Talwandi Kalan, Dist.- Ludhiana commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Faridpur, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Amritsar, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mand Dhilwan, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nabi Bakshwala, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mandbutala, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Manddesal, Dist.- Kapurthala commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raipur Arainan, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhoula, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sangowal, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Phillour, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Burj Bussan, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Lassara, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhagara, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kadiana, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raipur Gujran, Dist.- Jalandhar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Zahad Pur Jattan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dihana, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Shergarh, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kaillon, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jadujanda, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dagana Kalan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hardokhanpur, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bohan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Patti, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dadiana Kalan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bassi Gulam Hussain, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Hargarh, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mukhliana, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Badla, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Harta, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sukhiabad, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Saidu Patti, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak Gujran, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Fategarh Niara, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Powal, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Deowal, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Khalvana, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahaderpur, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nasrala, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Taggar Kalan, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dagana Khurd, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sherpur Bahtian, Dist.- Hoshiarpur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gagrewal, Dist.- Tarn-Taran commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhalojala, Dist.- Tarn-Taran commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Wazir Bhullar, Dist.- Amritsar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chaharpur, Dist.- Amritsar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kotili Barwala, Dist.- Amritsar commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Talwara Gujjran, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Talwara Jattan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nangal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Naushera Nalwanda, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhawle, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Beli Changa, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Aner, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tajpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Garmar, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak Ram Sahai, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak Hari Rai, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dulpat, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Raji Beli, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Galri, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Barsoon, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhatwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Tara, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bhadroya, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Treti Narang Pur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Simbli Gujran, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Abad Garh, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Nalunga, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gurra kalan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Manwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mast Garh, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Daulat Pur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Farida Nagar, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chhan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at jaswan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Shehar, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Siunti, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Garota Kalan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Khanpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Papial, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sahidpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Samrala, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gho, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Makeem Pur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Garota khurd, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dadwan, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jandroi, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Karoli, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Dhaki Sharda, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Chak chimna, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gunia, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Karkhara, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jhumber, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bherian, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Merra, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Gurah, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kathlore, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Mamoon, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Jandwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Bahgar, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Kounterpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Napwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Ghandran, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Sidhpur, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of River Mining Project at Deriwal, Dist.- Gurdaspur commissioned by Department of Industries and Commerce, Punjab.
  • Environmental Impact Assessment (EIA) of Mining Project at Subhanpur Bangar, Baghpat (U.P.) commissioned by M/s Charan Singh Mines
  • Environmental Impact Assessment (EIA) of Mining Project at Himachal Pradesh commissioned by Ashish Kumar & Others
  • Environmental Impact Assessment (EIA) of Mining at Ghatasher, Naanaul commissioned by M/s Vinod Kumar & Company.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Kherenia III , District Balrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Kherenia II , District Balrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Kherenia I , District Balrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Pachayra, GZBD commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Sukhela, Badaun commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Katri Paparkheda, Unnao commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Netuva, Unnao commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Kachla Kham Khand- I, Badaun commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of River bed mining project at Village Belbhatia, District Belrampur commissioned by Maroon Engineers Consultants (P) Ltd.
  • Environmental Impact Assessment (EIA) of The River Bed Mining Of Village Katra Parsola Chibramau Aera commissioned by Mr. Rakesh.
  • Environmental Impact Assessment (EIA) of The river bed mining of village at chnuki, Tehsil - Bhattapar rani (25 acres) Deoria U.P. commissioned by Mr. Ramakbal Nishad.
  • Environmental Impact Assessment (EIA) of The river bed mining of village at Gokulpur, Taluka: Diwayee, District: Bulandshar U.P. commissioned by Mr Vivek.
  • Environment Impact Assessment (EIA) of River bed mining of Adhawal, tehsil & dist. Fatehpur commissioned by Mr. Mahendra Singh Parihar.
  • Environment Impact Assessment (EIA) of Stone Mining Project at Gudwa, Sahibganj, Jharkhand commissioned by M/s Mineral India.
  • Environment Impact Assessment (EIA) of Stone Mining Project at Gudwa, Sahibganj, Jharkhand commissioned by M/s Hill Movement.
  • Environment Impact Assessment (EIA) of Silica Sand Mining Project at Village-Sonwal Taluka, Dist. Allahabad commissioned by M/s Lajpat Rai.
  • Environment Impact Assessment (EIA) of Sand Mining Project at Karnal Unit-2, Karnal Haryana commissioned by Shri Devender Nagpal.
  • Environment Impact Assessment (EIA) of Sand Mining Project at Karnal Unit-1, Karnal Haryana commissioned by Shri Vipin Gupta.
  • Environment Impact Assessment (EIA) of Sand Mining Project at Karnal , Haryana commissioned by Shri Rajvir Chauhan.
  • Environment Impact Assessment (EIA) of “Yamuna Nagar Unit-2” at Distt. Yamuna Nagar (Haryana) commissioned by M/s Astin Excavation & Mining Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Sand stone mining at Ambala, Unit-3, Haryana commissioned by Planet Steel Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Sand mining projects at Dist. Hamirpur, U.P. commissioned by Smt. Geeta Singh.
  • Environment Impact Assessment (EIA) of sand mining project at Tehsil-Urai, District-Jalaun, U.P. commissioned by Mr. Ramesh Kumar Mishra.
  • Environment Impact Assessment (EIA) of mining project at Village: babarjar, District. Jamnagar, Gujrat commissioned by Viya mines & minerals.
  • Environmental Impact Assessment (EIA) of Sand Mine Project located Himmat Nagar, Gujarat commissioned by All India Minerals.
  • Environmental Impact Assessment (EIA) of Stone Limestone Mine Project M.L. 23/06 located at Village - Dhanapa, Tehsil - Merta City, District - Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project M.L. 23/07 located at Village-Tukliya, Tehsil-Merta City, District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar
  • Environmental Impact Assessment (EIA) of Limestone Mine Project M.L. 24/07 located at Village-Tukliya, Tehsil-Merta City, District-Nagaur, Rajasthan commissioned by Mr. Mahendra Khokhar
  • Environmental Impact Assessment (EIA) of Stone Bolder Mine Project at Plot No. 3 Village-Bakhrija, Narnaul, Mahendragarh, Haryana commissioned by Everrise Advisory Services Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Magnesium Silicate Mine at Jharakhand commissioned by Jagannath Cement Works Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Navadra Limestone Mine located at village Navadra, District Devbhumi Dwarka State Gujarat, commissioned by Mr. Vivek Shah.
  • Environmental Impact Assessment (EIA) of Granite Mines, Gata No. 967 at Vllage Kulpahar, District Mahoba, Uttar Pradesh commissioned by Mr. A.K. Tripathi.
  • Environmental Impact Assessment (EIA) of Granite Mines, Gata No.1370 at Vllage Kulpahar, District Mahoba, Uttar Pradesh commissioned by Mr. A.K. Tripathi.
  • Environmental Impact Assessment (EIA) of Limestone Mine MI No. 14/94, at Aroliya village Jhalwar Rajasthan commissioned by Mr. Govind Dhattatre.
  • Environmental Impact Assessment (EIA) of Limestone Mine MI No. 97/89, at Aroliya village Jhalwar Rajasthan commissioned by Mr. Govind Dhattatre.
  • Environmental Impact Assessment (EIA) of Limestone Mine MI No. 26/11, at Aroliya village Jhalwar Rajasthan commissioned by Mr. Govind Dhattatre.
  • Environmental Impact Assessment (EIA) of Quartize Mine Project at Munger, Bihar commissioned by Mr. Sajid Hussain.
  • Environmental Impact Assessment (EIA) of Stone Mine project at pahara, Dist. Mahoba, U.P commissioned by Sh. Himmat Singh.
  • Environmental Impact Assessment (EIA) of Granite Mine at Village - Katar, Dist. Bhilwara, Rajasthan, commissioned by Waysan Industries.
  • Environmental Impact Assessment (EIA) of Bawal Tanda Mine at Dist. Jhansi commissioned by J.K. Minerals.
  • Environmental Impact Assessment (EIA) of Malka Granite Mine at Chatarpur, M.P commissioned by Mr. J.P.Singh.
  • Environmental Impact Assessment (EIA) of Limestone Mine project at Dist. Satna, M.P commissioned by Smt. Urmila Tripathi.
  • Environmental Impact Assessment (EIA) of Limestone Mine Project at Village Begoudi,Dist. Satna, M.P commissioned by Mr. Somendra Singh.
  • Environment Impact Assessment (EIA) of Stone Mine Project by Himmat and Balwant Singh at Vill. Mahoba, U.P.
  • Environment Impact Assessment (EIA) of Sand/Moram Mine Project by Shri Sadri Nisad at Vill. Basaiya, Dist. Khushi Nagar, U.P.
  • Environment Impact Assessment (EIA) of Sand/Moram Mine Project by Shri Sadri Nisad at Vill. Sahabganj, Dist. Khushi Nagar, U.P.
  • Environment Impact Assessment (EIA) of Sand Mine Project by Mohan Pal Singh Pannu at Jagatpur, Dist. Kathua, Jammu and Kashmir.
  • Environment Impact Assessment (EIA) of Sand Mine Project by Mohan Pal Singh Pannu at Kedan-Gandyal, Jammu and Kashmir.
  • Environment Impact Assessment (EIA) of Silica Major Mine Project by Sarthak Minerals at Tehsil Bara, Allahabad, U.P.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine at Village Beri, Hamirpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine at Village Bhusli, Hamirpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine at Village Islampur, Hamirpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine at Village Birhar, Hamirpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine by Sukhraj at Village Kora Kanak, Fatehpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine at Village Gurwal, Fatehpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine by Bhadur Alias at Village Kora Kanak, Fatehpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine at Village Daulatpur Kachhar, Dist. Ramabai Nagar, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine by Shiv Sharan Gupta at Village Oati, Fatehpur, Uttar Pradesh.
  • Environmental Impact Assessment (EIA) of Sand/Moram Mine by Anil Kumar Gupta at Village Oati, Fatehpur, Uttar Pradesh.
  • Environment Impact Assessment of sand, stone Bajri mine at V.P.O Kalruhi The. Amb Distt. Una commissioned by M/s Jai Ganesh Stone Crusher Screening Unit, Himachal Pradesh
  • Environment Impact Assessment of sand, stone Bajri mine at V.P.O Dhangota Distt. Hamirpur commissioned by Jai Baba Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of sand, stone and Bajri mines at Mahesh Stone Crusher Mauza and Mohal Abhaypur of Tec. Amb Distt. Una commissioned by Mahesh Stone Crusher.
  • Environment Impact Assessment of sand, stone and Bajri mines at Mauza Kotla, Tehsil Nahan, Distt. Sirmour, commissioned by M/s Shiv Shakti Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of Sand stone Bajri Mine at vill. Mauza/Mohal Khanpur in Tehsil Indora Distt Kangra Commissioned by M/s. Umapati Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of Sand stone Bajri Mine at vill Mauza Khanni Mohal Pail in Tehsil Nurpur Distt. Kangra Commissioned by Shri Ram Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of Sand stone Bajri Mine at vill. Maira Doomal/Maira Batrah in tehsil Nurpur Distt. Kangra Commissioned by M/s Shiva Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of Sand stone Bajri Mine at VPO Mohtli, G.T. Road Damtal in Distt. Kangra commissioned by Krishna Stone Cruher, Himachal Pradesh.
  • Environment Impact Assessment of sand stone Bajri Mine at Damtal in Tehsil Indora Distt Kangra commissioned by Abbi Stone Crushing Co., Himachal Pradesh.
  • Environment Impact Assessment of sand stone Bajri Mine at village Maira Doomal/Maira Batrah in Tehsil Nupur Distt Kangra commissioned by M/s. New Shiva Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of sand mine Bajri Mine at Vill. Bari Kandrori in tehsil Indora Distt Kangra commissioned by M/s. Jai Shankar Stone Crusher, Himachal Pradesh.
  • Environment Impact Assessment of sand stone mine at 63/8, village Bhusi Pathrahan, Tehsil-lalganj, Dist-Mirzapur commissioned by Mr. Anirudh Kumar Tewari, Uttar Pradesh.
  • Environment Impact Assessment of sand moram mine at Khand no-5, Zone no 6, vill-jagdeshpur, Tehsil- Bara, Dist-Allahabad commissioned by Smt. Mena Devi, Uttar Pradesh.
  • Environment Impact assessment of stone mine at PVO OEL Tehsil AMB Distt. Una commissioned by Shri Rudra Stone Crusher and screening Plant, Himachal Pradesh.
  • Environment Impact Assessment of stone mine at Jahu Kalan, P.O Jahu Tehsil Bohranj Distt Hamirpur commissioned by Sanjay Chauhan Stone Crusher, H.P.
  • Environment Impact Assessment of stone mine at village Manoh, P.O Karotha, Tehsil Bohranj, Distt. Hamirpur commissioned by Sanjay Chauhan Stone Crusher, H.P.
  • Environment Impact Assessment of Granite mine at vill. Pathariya Dist. Chhatarpur Commissioned by Chajurahho Minerals Pvt. Ltd, M.P.
  • Environment Impact Assessment of Bahagara Bauxite Mines, Lohardaga Commissioned by V.H Pathak Bahagarah Bauxite Mines, Jharkhand.
  • Environment Impact Assessment of sand/Moram Mine at village Bhenrikharka Khand 23/7 Dist. Hamirpur commissioned by Vinay Kumar Contractor, U.P.
  • Environmental Impact Assessment of stone mine at Basal Distt. Una commissioned by M/s Saraswati Stone Crusher and Screening Unit, H.P.
  • Environmental Impact Assessment of Janardanpur Limestone mine at Dist. Satna, commissioned by Shri Sankatha Prasad Dwivedi, M.P.
  • Environmental Impact Assessment of Dolostone Mine at village Vardiya Tehsil Robertsganj Dist. Sohanbhadra commissioned by Kamuranchal Stone crushing Corporation, U.P.
  • Environmental Impact Assessment of stone mine at village Makarbai Dist.Mahoba commissioned by Reita Puwar, U.P..
  • Environmental Impact Assessment of stone mine at village Pahora Dist. Mahoba commissioned by Suraj Prasad, U.P.
  • Environmental Impact Assessment of stone mine at village Pahra Dist. Mahoba commissioned by Neeraj Kumar, U.P.
  • Environmental Impact Assessment of stone mine at village Kulpahad Dist. Mahoba commissioned by Naimurehaman, U.P.
  • Environmental Impact Assessment of stone mine at village Pahora Dist. Mahoba commissioned by Ram Gopal, U.P.
  • Environmental Impact Assessment of stone mine at Dehorra Dist. Mahoba commissioned by A.K Tripathi, U.P.
  • Environmental Impact Assessment of stone mine at village Pahra Dist. Mahoba commissioned by Shiv Vijay,U.P.
  • Environment Impact Assessment of Quartz mine at Ligri Dist. Katni commissioned by Ligri Quartz mine, M.P.
  • Environment Impact Assessment of Barhaiya stone mine at Dist. Satna commissioned by Barhaiya Stone Mine, M.P.
  • Environment Impact Assessment of stone mine at P.O Beolia commissioned by Kapoor Stone Crusher, Shimla, U.P.
  • Environment Impact Assessment Of sand Moram Mine at Plot no. K-2 Village Korakanak, Dist Fatehpur Commissioned by Mr. Sukhraj Uttar Pradesh.
  • Environment Impact Assessment Of Ara Fireclay mine Distt Latehar Commissioned by M/s Lal Ugratara Nath Shahdeo Jharkhand.
  • Environment Impact Assessment Of Sand Mine at village Earch Tehsil Garotha Distt. Jhansi Commissioned by M/s Meera Yadav U.P.
  • Environment Impact Assessment Of sand Moram Mine at Plot no. K-2 Village Korakanak, Dist Fatehpur Commissioned by Mr. Sukhraj Uttar Pradesh.
  • Environment Impact Assessment Of Ara Fireclay mine Distt Latehar Commissioned by M/s Lal Ugratara Nath Shahdeo Jharkhand.
  • Environment Impact Assessment Of Sand Mine at village Earch Tehsil Garotha Distt. Jhansi Commissioned by M/s Meera Yadav U.P.
  • Environment Impact Assessment of Soap Mines at Brahandungri commissioned by Ganga Engineering, Jharkhand.
  • Environment Impact assessment Of Pallar, Bawal & Tanda Diaspore Pyrophyllite Mine at Pallar Bawal & Tanda commissioned by Sahaj Sahyog Consultants Pvt. Ltd, Jhansi.
  • Environment Impact assessment Of Bijri Diaspore Pyrophyllite Mine at Bijri, Lalitpur commissioned by Sahaj Sahyog Consultants Pvt. Ltd, Jhansi.
  • Environment Impact Assessment of Mailar Shivpura Diaspore Pyrophyllite Mine at Mailar Shivpura, Lalitpur commissioned by Sahaj Sahyog Consultants Pvt. Ltd, M.P.
  • Environment Impact Assessment of Garhari Diaspore Pyrophylite mine at Garhari commissioned by Sahaj Sahyog Consultants Pvt. Ltd. Jhansi,M.P.
  • Environment Impact Assessment of Kuchmaila Kothar Laterite Ochres & white clay mine at Kuchmaila commissioned by M/s Smt. Nirmala Devi Khemka, M.P.
  • Environment Impact Assessment of Badera-kala ochre & laterite mine at Jaitwara Dist Satna commissioned by M/s Heeralal Sundarlal Agrawal, M.P.
  • Environment Impact Assessment of Barui Bauxite and laterite mine at Barui and karigohi commissioned by Mr. R.C agrawal, M.P
  • Environment Impact Assessment of Hadsbadpur Limestone mine at village Hadbadpur, tehsil Rajhuraj nagar commissioned by Shri Ramanand Shukla, M.P.
  • Environment Impact Assessment of Bathia Kala Limestone mine at Bathia Kala Tehsil Raghuraj Nagar, village Lalpur commissioned by Shri Kamlendra Singh, M.P.
  • Environment Impact Assessment of Lalpur Limestone mine at village lalpur tehsil-Raghuraj Nagar Distt-Satna commissioned by Shri Kamlendra Singh, M.P.
  • Environment Impact Assessment of Bhatia kala Limestone mine at Bathia Kala tehsil-Raghuraj Nagar commissioned by Shri Ramanand Shukla, M.P.
  • Environment Impact Assessment for Bauxite Mine at Narma Commissioned by Ashok Kumar Poddar, Jharkhand.
  • Environment Impact Assessment for Bauxite Mine at Jillingsire Commissioned by Pawan kumar Poddar, Jharkhand.
  • Environmental Impact Assessment of Moram Mine at village Kharwanch, Jhansi Commissioned by Mr. Devesh Kumar Singh, U.P.
  • Environmental Impact Assessment of Moram Mine at plot no. 10/33. Village Beri, Hamirpur Commissioned by Mr. Rakesh Kumar Aggarwal& Rahul Singh,U.P.
  • Environmental Impact Assessment of sand moram mine at village Sahurapur, Dist. Hamirpur Commissioned by Mr. ManojTiwari, U.P.
  • Environmental Impact Assessment of Moram Mine at plot no. 18/3, village Sahupur, Hamirpur Commissioned by Mr. Anil kr. Gupta.U.P.
  • Environmental Impact Assessment of sand moram mine at khand 13, village risoda, Dist. Banda Commissioned by Mr. Virender Singh. U.P
  • Environmental Impact Assessment of sand moram mine at village Gaur Shivpur, Dist. Banda Commissioned by Mr. Anil kr. Gupta,U.P.
  • Environmental Impact Assessment of Sand Moram Mine at village ShadiMadanpur, Dist. Banda Commissioned by Mr. DaljitSingh,U.P
  • Environmental Impact Assessment of Moram Mine at Village Gajraura, Dist. Jalon Commissioned by Mr. D K Singh, KhushDhwaj Singh, BasantChaturvedi,SomnathSharma,U.P
  • Environmental Impact Assessment of Moram mine at village Simariya, Jalon Commissioned by Mr. D K Singh, KhushDhwaj Singh, BasantChaturvedi, GauravSom Sharma village Simariya, U.P.
  • Environmental Impact Assessment of Morammineatkhand no. 5, village erach, dist Jhansi Commissioned by Mr. Rahul Singh,U.P.
  • Environmental Impact Assessment of Moram Mine at Village Erach, Dist Jhansi Commissioned by Mhd. Rafiq.U.P.
  • Environmental Impact Assessment of Sand Mine at Plot no. 6, Village Pathari, Dist. Banda Commissioned by Mr. Shiv saran Singh, U.P.
  • Environmental Impact Assessment of Sand moram Mine at village Barheta, Dist Banda Commissioned by Mr. ShirajDhawaj Singh, U.P.
  • Environmental Impact Assessment of Moram mine at Plot no.19/3, village Tikkapur, Hamirpur Commissioned by Mr. MunnilalAggarwal, Vijay Singh, Rakesh Kr Aggarwal&Rafiq Ahmed, U.P.
  • Environmental Impact Assessment of Moram mine at Plot no. 12,villageRameri,Hamirpur Commissioned by Mr.Dilip Singh and Wasifzamakhan,UP.
  • Environmental Impact Assessment of sand mine at village Garautha,Dist. Jhansi Commissioned by Mr. Devesh Kr. Singh, U.P.
  • Environmental Impact Assessment of sand mine at village Bhurendi, Dhurendi Dist. Banda Commissioned by Mr. Dilip Kr. Singh, U.P.
  • Environmental Impact Assessment of sand mine at village AmrolKhadar, Dist. Banda Commissioned by Mr. Manoj Kr. Tiwari,U.P
  • Environmental Impact Assessment of sand mine at village Bhurendi, Kanwara, Chilehata Dist. Banda Commissioned by Mr. SomeshBhardwaj,U.P.
  • Environmental Impact Assessment (EIA) of Sand Stone and Bajri mine at Vullage& P.O KUngrat, Tehsil Haroli, Dist. Una commissioned by Shivalik stone Crusher, Himachal Pradesh.
  • Environmental Impact Assessment (EIA) of Moram Mine, Village Gurwal, Tehsil-KhagaFatehpur commissioned by Mr. SukhRaj, U.P
  • Environmental Impact Assessment (EIA) of Moram Mine, Village KorraKanakFatehpur commissioned by Mr. Sahiruddin, U.P
  • Environmental Impact Assessment (EIA) of Moram Mine, Village KorraKanakFatehpur commissioned by Mr. Shiv Singh, U.P
  • Environmental Impact Assessment (EIA) of Chirodih Bauxite Mine at P.S Bishunpur Dist. Gumla commissioned by Madan Mohan Prasad Singh, Jharkhand
  • Environmental Impact Assessment (EIA) of Sand,Stone and Bajri Mine at Poanta Sahib Dist. Sirmour commissioned by Ashish kumar himachal Pradesh.
  • Environmental Impact Assessment (EIA) of steel Plant at Maneri, commissioned by Arfa Steels and Minerals Pvt. Ltd., M.P.
  • Environmental Impact Assessment (EIA) of Sand Mine commissioned by Mr. Virender Kumar Rai dist. Jhansi, UP.
  • Environmental Impact Assessment (EIA) of Bauxite Mine commissioned by GEOMAX Mines and Minerals Pvt. Ltd., Jharkhand.
  • Environmental Impact Assessment (EIA) of Pryophite and Disapore Mine Commissioned by M/s Vinod kumar Trivedi,Gourhari,Dist. Mahoba(U.P.)
  • Air Quality Modelling Study of Lanjiberna Limestone Mines Project, Orissa (2004) sponsored by Orissa Cement Corporation (OCC).
  • Air Quality Modelling Study of Sukinda Chromite Mines, Orissa (2004) sponsored by Tata Steel.
  • Environmental Impact Assessment (EIA) for the Sakhri Bauxite Mine at Sakhari Village, Tah: Mandangad, District:Ratnagiri, Maharashtra. Commissioned by Ashapura Minechem Ltd. Clean Development Mechanism (CDM) at Rohtak & Shahabad Sugar Mills. commissioned by Haryana State Federation of Co-operative Sugar Mills Ltd.
  • Environmental Impact Assessment (EIA) for the Karivane bauxite Mine at Karivane Village, Shriwardhan Taluk, District: Raigad, Maharashtra. Commissioned by Alatge Stone Crushing Industries. (A subsidiary of Ashapura Minechem Ltd.)
  • Environmental Impact Assessment (EIA) of Chanpi Bauxite Mine Project at Lohardaga , Jharkhand commissioned by M/s Arbind Kumar Singh Mine Owner.
  • Environmental Impact Assessment (EIA) of Jobhipat Bauxite Mine Project at Gumla, Jharkhand commissioned by M/s O.P. Gupta Mine Owner.
  • Environmental Impact Assessment (EIA) of Pakhar Bauxite Mine Project at Lohardaga, Jharkhand commissioned by Gandharva Oran.
  • Environmental Impact Assessment (EIA) of Soapstone Mine Project at Village Kidai/Khwasi, Dist.- Bageswar, Uttarakhand commissioned by New Hills Mines and Minerals.
  • Environmental clearance for the Karnakote Laterite Mine commissioned by Cement Corporation of India, GOI.
  • Environmental clearance for the Karnakote Shale Mine commissioned by Cement Corporation of India, GOI.
  • Environmental clearance for the Karnakote Limestone Mine commissioned by Cement Corporation of India, GOI.
  • Hydro Geological Study for Sakhri Bauxite at Ratnagiri, Maharashtra commissioned by Ashapura Minechem Ltd.
  • Environmental Impact Assessment (EIA) of Coal Mine Project, Warora West (North) at Wardha Valley Dist. Chandrapur, Maharastra commissioned by Bhatia International Ltd.
  • Environmental Impact Assessment (EIA) of Harup Bauxit Mine Project at Lohardaga, Dist.- Jharkhand commissioned by Chandrakant Tulasidas Popat.
  • Environmental Impact Assessment (EIA) of Bagru Bauxite Mine Project at PO. Bagru, PS. Kisko, Dist.- Lohardaga, Jharkhand commissioned by Madan Mohan Prasad Singh.
  • Environmental Impact Assessment (EIA) of Narma Bauxite Mine Project at PO. Jobhipat, PS. Bishunpur, Dist.- Gumla, Jharkhand commissioned by Madan Mohan Prasad Singh.
  • Environmental Impact Assessment (EIA) of Minor Mineral at Yamuna River, Village Rampur Mandi commissioned by M/s Doiwala Sahkari Shram Samwida Samiti Limited
  • Environmental Impact Assessment (EIA) of Minor Mineral at Tons River, Plot-1 Village Haripur commissioned by M/s Doiwala Sahkari Shram Samwida Samiti Limited
  • Environmental Impact Assessment (EIA) of Virpur Bauxite MinesArea 55.2520 Hect. S.No. 110/P Vill. Virpur, Jamnagar,State- Gujarat commissioned by Pushpaben Prabhudas Makhecha
  • Environmental Impact Assessment (EIA) of Rabda Graphite Mine at Palamu commissioned by Tirupati Carbons & Chemicals Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Murli Pahari Limestone Mine Project at Rohtas, Bihar commissioned by Kalyanpur Cement Ltd.
  • Environmental Impact Assessment (EIA) of Sand – Clay Mine Project at Jharkhand commissioned by Dalmia Agencies Pvt. Ltd.
  • Environmental Impact Assessment (EIA) of Serka & Serangdag Bauxite Mines Project at Lohardaga commissioned by Umesh Prasad Agrawal.
  • Environmental Impact Assessment (EIA) of Kujam Bauxite Mines Project at Lohardaga commissioned by Gyanchand Prasad Agarwal.
  • Environmental Impact Assessment (EIA) of Serka & Serangdag Bauxite Mines Project at Lohardaga commissioned by Umesh Prasad Agrawal.
  • Environmental Impact Assessment (EIA) of Kujam Bauxite Mines Project at Lohardaga commissioned by Gyanchand Prasad Agarwal.
  • Environmental Impact Assessment (EIA) of The Moram mine at Village: Aktthal 7 mattiyam District: Kushinagar (U.P) commissioned by Ram Vilas Nishad.
  • Environmental Impact Assessment (EIA) of The Moram Mine at Tehsil: Heeta Distirct: Kushinagar U.P. commissioned by Babu Lal Sahani.
  • Environmental Impact Assessment (EIA) of Moram Mine at Plot no. K3, Village Kora Kanak Fatehpur, U.P commissioned by Mr. Ajay Kumar Gupta.
  • Environmental Impact Assessment (EIA) of Moram Mine at Plot no. K1, Village Kora Kanak Fatehpur, U.P commissioned by Mr. Bahadur Aliyas Ram Bahadur.
  • Environmental Impact Assessment (EIA) of Pardawan Silica Mines at Pardawan, Chitrakoot, U.P. commissioned by Rai Bharat Dasa & Brothers.
  • Environmental Impact Assessment (EIA) of Moram Mine at Sangolipur Garha, Teh: Khaga District Fatehpur, U.P commissioned by Mr. Daljit Singh.
  • Environmental Impact Assessment (EIA) of Sand Mine at Sonbhadra, Uttar Pardesh commissioned by Ved Prakash Yadav.
  • Environmental Impact Assessment (EIA) of Sand Mine at Sonbhadra, Uttar Pardesh commissioned by Sudhakar Panday.
  • Environment Impact Assessment (EIA) of Gamarkocha Pyroxenite Mines, vill- Gamarkocha, dist- East singhbhum, Jharkhand commissioned by Mr. Khirod Mudi
  • Environment Impact Assessment (EIA) of Matku Pyroxenite Mine at Village matku, Dist- Singhbhum commissioned by Mr. Shekhar Singh
  • Environment Impact Assessment (EIA) of Stone mine at Koderma (Jharkhand) commissioned by Mr. Ramjeet Mehta
  • Environment Impact Assessment (EIA) of Soap stone & Marble Mine at village Karmal Dist. Sidhi (M.P) commissioned by Karan Minerals
  • Environment Impact Assessment (EIA) of Sand Stone and Bajjri Mine at Kuthera Jaswalan Nichala Tehsil amb Dist. Una (H.P) commissioned by M/s Bharat Stone Crusher
  • Environment Impact Assessment (EIA) of Stone mine commissioned by M/s. Narsingh Lagdhir at Vill. Bakudih, PS Taljhari, Dist Sahibganj (Jharkhand)
  • Environment Impact Assessment (EIA) of Sione Mine at Dantuta, PS Chattarpur, Dist Palamu, Jharkhand commissioned by M/s. Omprakash
  • Environment Impact Assessment (EIA) of Stone Mine at Majhaladih, PS Shikaripara, Dist. Dumka, Jharkhand commissioned by M/s. Gobardhan Stone Works
  • Environment Impact Assessment (EIA) of Quartzite Mines at Munger Commissioned by Khalsa Stone Works , Bihar
  • Environment Impact Assessment (EIA) of Marble Mine Quarry Lease at Village Karmal, District Sidhi commissioned by Karan Minerals M.P.
  • Environment Impact Assessment (EIA) of Paddhar China Clay Mines at Village Paddar, Taluka Bhuj, District Kutch commissioned by Shree Ram Min Chem International , Gujarat
  • Environment Impact Assessment (EIA) of River Bed mine at Banaganga River of Lot name Balawali commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Bnaganga River of Lot name Raysi(Laksar) commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Bnaganga River of Lot name Nehandipur commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ratmau Nadi (Roorkee) River of Lot name Majmata commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ratmau Nadi (Roorkee) River of Lot name Daluwala commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Banjarewala (Biharigarh) River of Lot name Banjarewala-II commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Budhwa Shahid (Biharogarh) River of Lot name Budhwa Shahid-10 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ganga River of Lot name Bisanpur Kundi-8 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ganga River of Lot name Bhogpur-6 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ganga River of Lot name Misserpur commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ganga River of Lot name Ajeetpur commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ganga River of Lot name Dhobighat commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Suddhowala River of Lot no. 20/13 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Ganga River of Lot no. Rishikesh commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Chandrabhaga River of Lot name Rishikesh commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Baldi River of Lot no. 15/3, 15/4 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Kalirao River of Lot no.5/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot no. 23/3 commissioned by Garhwal Mandal Vikas Nigam Ltd
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot no. 23/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot no. 21/3 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot no. 21/2 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot no. 21/1 commissioned by Garhwal Mandal Vikas Nigam Ltd
  • Environment Impact Assessment (EIA) of River Bed mine at Sheetala River of Lot no.16/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Saarna River of Lot no. 17/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/14 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/13 commissioned by Garhwal Mandal Vikas Nigam Ltd
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/10 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/9 commissioned by Garhwal Mandal Vikas Nigam
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/8 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/7 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/6 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/5 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/4 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/2 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Jakhan (Majari Grant) River of Lot no. 13/2 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Jakhan( Rani Phokhri Grant) River of Lot no. 13/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Suswa River of Lot no. 12/2 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Noon River of Lot no. 8/4 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Kaligaad River of Lot no. 11/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Noon River of Lot no. 8/3 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Song River of Lot no. 7/2 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Song River of Lot no. 7/1 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Rispna River of Lot no. 4/4 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Rispna River of Lot no. 4/3 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/14 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/13 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/12 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/11 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/10 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/9 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/8 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/6 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/4 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/3 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/12 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Aasan River of Lot no. 14/11 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of River Bed mine at Tons River of Lot no. 3/2 commissioned by Garhwal Mandal Vikas Nigam Ltd.
  • Environment Impact Assessment (EIA) of Amheta Limestone & Dolomite Mine commissioned by K.C. Bagaria & Sons
  • Environment Impact Assessment (EIA) of stone mine at pontasahib HP commissioned by Smt. Shakuntala Chandel
  • Environment Impact Assessment (EIA) of stone mine at Pontasahb HP commissioned by Mr. Sanjay Kishore
  • Environment Impact Assessment (EIA) of stone mine at Pontasahib, HP commissioned by Tribhuvan Stone Crusher
  • Environment Impact Assessment (EIA) of Stone mine at Pontasahib, HP commissioned by Mr. Indersingh
  • Environment Impact Assessment (EIA) of Stone mine at Pontasahib, HP commissioned by Mr. Anil Sharma
  • Environment Impact Assessment (EIA) of Stone mine project at Rampur Ghat, Pontasahib (H.P.) commissioned by Mr. Gajender Pal Singh.
  • Environment Impact Assessment (EIA) of Sand Stone Bajri mine at mauza Nawada, HP commissioned by M/s Subhgiri Industries
  • Environment Impact Assessment (EIA) of Paldev White Clay Mine at Dist. Satna (M.P) commissioned by Sandeep Kumar Bansal
  • Environment Impact Assessment (EIA) of Satri Sajjanpur Limestone Mine at Dist. Satna(M.P) commissioned by Sh. Vipin Kumar Chaurasiya
  • Environment Impact Assessment (EIA) of Stone Mine at Vill. Mirapara, Thana-Boria, Dist. Sahibganj, Jharkhand commissioned by M/s Abhimanyu Stone Works
  • Environment Impact Assessment (EIA) of Sand Stone Mine at Vill. Sirad, Pithoragarh commissioned by Smt. Kumud Mahar.
  • Environment Impact Assessment (EIA) of Bitma Laterite & Ochers Mine at village- Bitma, Tehsil- Birshingpur, District- satna, M.P. commissioned by M/s Neetu Singh
  • Environment Impact Assessment (EIA) of Barui Ochres Bauxite & Laterite mine at Dist. Satna (M.P.) commissioned by Rakesh Agencies.
  • Environment Impact Assessment (EIA) of Hinouta Limestone Mine at Dist. Satna (M.P.) commissioned by Sh. Ajay Kumar Pathak.
  • Environment Impact Assessment (EIA) of Mankahari Limestone Mine at dist. Satna (M.P.) commissioned by Sh. Mahesh Kumar Chaurasiya.
  • Environment Impact Assessment (EIA) of Tilheri Marble Mine at Dist. Katni (M.P.) commissioned by Sumer Marbles.
  • Environment Impact Assessment (EIA) of Dhangawan Laterite Deposit at Dist. Jabalpur (M.P) commissioned by M/s Aaryabhatta Mines & Minerals Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Hardua Kala Laterite & Dolomite mine at Dist. Jabalpur (M.P) commissioned by M/s Galaxy Mines & Minerals.
  • Environment Impact Assessment (EIA) of sandstone bajri mine project at Burwa, Tehsil Manali, Dist Kullu, HP commissioned by M/s. Paras Stone Crushers.
  • Environment Impact Assessment (EIA) of sand stone bajri mine at Vill. Ukrolli, Tehsil-Sitarganj, Dist-Udhamsinghnagar commissioned by Mr. Sanjay Pandey.
  • Environment Impact Assessment (EIA) of Sand stone bajri mine at Vill-Rampur, Raighati, Dist- Mr. Amit Bhardwaj.
  • Environment Impact Assessment (EIA) of Sand stone mine at vill. Barakot, Tehsil-Jainti, Dist. Almora commissioned by Mr. Dhan Singh.
  • Environment Impact Assessment (EIA) of stone mine at Pipaljori, Jharkhand commissioned by M/s Basant Stone Works.
  • Environment Impact Assessment (EIA) of Stone mine at Motijharna, Jharkhand commissioned by Mayur Machine Pvt. Ltd.
  • Environment Impact Assessment (EIA) of stone mine unit at Rajbandh,Pakur Jharkhand commissioned by M/s Mahadev Stone Products.
  • Environment Impact Assessment (EIA) of sand stone mine at Dist Almora commissioned by Mr. Bhupesh Bist
  • Environment Impact Assessment (EIA) of Dias pore/Pyrophillite mine at Dist. Tikamgarh, MP commissioned by Khujraho Minerals Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Dias pore/Pyrophillite mine at Dist. Chattarpur, MP commissioned by Khujrao Minerals.
  • Environment Impact Assessment (EIA) of River Bed mine at River Dholi Ganga of Lot name Dholi Ganga River ambu commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Kali Ganga of Lot name Kali Ganga River Chharchhun, Syankuri Ranthi, Takull (Mansi) Pangla commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Gori of Lot name Gori River Bangapani Toli, Dutibagar commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Jamrari commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Kali Ganga of Lot name Kali anga Majirkanda commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu of Lot name Saryu River Dubola, Birtola, Kharkoli, Timta commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Kali Ganga of Lot name Kali River Titari commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Kali Ganga of Lot Kali Ganga River Titari, Ghigharni, Sinoli, Chamtoli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Gori Ganga of Lot name Gori Ganga River aelthi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ramganga of Lot name Ramganga River Bhadeli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Gori Ganga of Lot name Gori Ganga River Kotal Ganw Kati commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ramganga of Lot name Ramganga River Falyat Bhanskhal commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Gagas of Lot name Gagas River Bhikyasain commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Devta of Lot name Devta River Jargown commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ramganga Bind of Lot name Ramganga Bind River sangam Sater commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Binod of Lot name Binod River karchulibagrh Kahargown Palpur commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Gagas of Lot name Gagas River Bhikyasan commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Ramganga of Lot name Ramganga River Ranikhet Udlikhan commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Gagas of Lot name Gagas River Dhamkot commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Panar River nayal dhura commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Panar of Lot name Panar River/ Panar area(Near Village dhuriya Nayal) commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Dungriramela/Sukrar Gadera commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Kosi of Lot name Nanha Kosi River Bhanarath commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Swal of Lot name Swal River Tatik commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Nanha Kosi of Lot name Nanha Kosi River Chona commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Nanha Kosi of Lot name Nanha Kosi River Patherkot commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Binsar of Lot name Binsar River Patshal commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ladhya of Lot name Laghya River Diyuri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ladhya of Lot name Laghya River Jhalakudicommissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ladhya of Lot name Laghya River Nulapni patti Sukhpani commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ladhya of Lot name Laghya River Simkhet commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ladhya of Lot name Laghya River Chorapita commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ladhya of Lot name Laghya River commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ramganaga of Lot name Ramganaga Gojna commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ramganaga of Lot name Ramganaga Hooli Piplayi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Ramganaga of Lot name Ramganaga Botari Patti Barakot commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Saryu Ramganag of Lot name Saryu Ramganga Botari Patti Barakot commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Noola Pani commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Dyuri/Bhanoli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Dudhuri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Ladhiya River Silar Patti Shukidhank commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at HuddiThawalkhera commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Huddi Genda Khali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Huddi Nayak Khera commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Huddi Tankpur commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Quarala Amori to Banlekh commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Sharda of Lot name Sharda River Ucholigunth commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Koteshwar commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Srikot Ganganani commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Bhalgawn commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Mandakini of Lot name Bheeri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Mandakini of Lot name Jalai commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Mandakini of Lot name Sansari commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Mandakini of Lot name Hat commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Mandakini of Lot name Chandrapuri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Mandakini of Lot name Bheeri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Mandakini of Lot name Rampur commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Binsar of Lot name Binsar River Degoli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Swal of Lot name Swal River Talli Chorli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Dhauli Ganga of Lot name Bhagawn commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Birhi (Gunth) commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Birhi of Lot name Birhi (Sainji) commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Chepdo(Baghan) commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Tharali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Pankti commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Nalgawn commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Sainlkhola commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Sainikhola commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Chaipdo commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Sarkot commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Pindar of Lot name Simli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Pandukeshwar commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Khero, Lambagad commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Sonla Dasholi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Math (Nagpur) commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Kaleshwar commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at River Alaknanda of Lot name Bhatt Nagar commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Alaknanda River of Lot name Dasholi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Alaknanda River of Lot name Bhedgawn commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Alaknanda River of Lot name Lagasu commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Alaknanda River of Lot name Jaikandi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Kamal Nadi River of Lot name Khaladi (Purola) commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at Kamal Nadi River of Lot name Purola commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Kamal Nadi River of Lot name Khabalisera commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Dkhyat gawn commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Ponti commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Kandi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Mungra Bagasu commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Bagasu commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Mungra commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Kharadi- Nandgawn commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Badkot 111 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Badkot 11 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name badkot 1 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Badkot 3 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Yamuna River of Lot name Badkot 1&2 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Hadiyadi-2 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Hadiyadi-11 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Hadiyadi-1 commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Tunyada commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Dharansu Nagnichoti commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Patra Sigudi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Fifiyara Sigudi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Ujeli Badahat commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Kailash Matli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Nagun Chinyali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Nagudgad Nagud Chinyali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Tulyada Hadiyadi hadiyadi Badkot commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Chinyali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Ranuwa – Dunda Ranadi Chinyali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Badethi barsali Gursaida-Matli Naitha –Sigenti commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Naitha-Matli commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Gusaida-Matli commissioned by Directorate of Industries Uttarakhand
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Badethi Barsali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Dowah (Thanal) commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Jhala commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Siror commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Maneri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Netala commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Ranadi commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Raduwasa-Dunda commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Dunda Chinyali commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Dunda commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Singoti commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Dilsaur commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Kansain commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Tiloth commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Gyansu commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Badahat commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Ujeli Badahat commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Tekhla Badahat commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Thali Siror commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Thali Siror commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Syuna Siror commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Heena commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Heena commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Newala commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Maneri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Bhatwari maneri commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of River Bed mine at Bhagirathi River of Lot name Bhatwari commissioned by Directorate of Industries Uttarakhand.
  • Environment Impact Assessment (EIA) of Limestone Mine at Dist: Jhalawar, Rajasthan commissioned by Shri Pukhraj Jain.
  • Environment Impact Assessment (EIA) of Granite mine at village Sakadara, Rajasthan commissioned by M/s Baghmal Marble Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Limestone mine at District- Jhalawar, Rajasthan commissioned by Shri Rahul Jain.
  • Environment Impact Assessment (EIA) of Graphite Mine at Vill Purnadih, Dist. Palamau, Jharkhand commissioned by Geomax Mines & Minerals Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Kalali & Kalyana mine in Tehsil Dadri, Dist. Bhiwani, (Haryana) commissioned by Associated Soapstone Distributing Co. Pvt. Ltd.
  • Environment Impact Assessment (EIA) of Stone Mine Project at Village-Sindhora, Dist. Mirjapur, UP commissioned by Shri Rajesh Kumar Tripathi.
  • Environment Impact Assessment (EIA) of Granite Mine at Siyaisara,Sirohi, Rajasthan commissioned by M/s Kamla Devi.
  • Environment Impact Assessment (EIA) of “Yamuna Nagar Unit-4” at Distt Yamuna Nagar (Haryana) commissioned by M/s B.D. Mines.
  • Environment Impact Assessment (EIA) of marble mine at Kankroli, Rajsamand, Rajasthan commissioned by M/s Radha Krishna Marble.
  • Environment Impact Assessment (EIA) of Limestone mine at Village Aroliya, Tehsil Panchpahar, Dist. Jhalawar, Rajasthan commissioned by Shri Ramratan Modi.
  • Environment Impact Assessment (EIA) of Limestone mine at Village Aroliya, Tehsil Panchpahar, Dist. Jhalawar, Rajasthan commissioned by Shri Govindram Modi.
  • Environment Impact Assessment (EIA) of sand mine at Mahoba, U.P commissioned by Mr. Govind Kushwaha.
  • Environment Impact Assessment (EIA) of sand mine at Mahoba,UP commissioned by Smt. Vimla Devi.
  • Environment Impact Assessment (EIA) of Sand Boulder mine at Mahoba, UP commissioned by Shri Yogendra Kumar.
  • Environment Impact Assessment (EIA) of Sand Boulder Mine at Mahoba, UP commissioned by Shri Chandramauli Bhardwaj.
  • Environment Impact Assessment (EIA) of Marble Mine at village Tanwan, Tehsil-Amet, District Rajamand, Rajasthan commissioned by M/s Sangwaria Marble.
  • Environment Impact Assessment (EIA) of Sand Boulder mine at Mahoba, UP commissioned by Shri Yogendra Kumar.
  • Environment Impact Assessment (EIA) of Sand Boulder Mine at Village-Mudhar, Tehsil-Mahoba, District- Mahoba, U.P commissioned by Shri Chandramauli Bhardwaj.
  • Environment Impact Assessment (EIA) of Masonary stone mine at Village Bapcha, Tehsil- Chhabra, Dist. Baran, Rajasthan commissioned by M/s. Harish Yadav.
  • Environment Impact Assessment (EIA) of Stone mine at Rolagutu, Khunti commissioned by Vishal Construction.
  • Environment Impact Assessment (EIA) of Chine Clay mine at Dist. Bhilwara, Rajasthan commissioned by M/s Tulsi Mines & Minerals.
  • Environment Impact Assessment (EIA) of Granite mine at Village- Nareli, Dist.-bhilwara, Rajasthhan commissioned by Rajendra Kumar Chandaliya.
  • Environment Impact Assessment (EIA) of Granite mine at dist. Bhilwara, Rajasthan commissioned by M/s Ajit Marble Pvt. Ltd.
  • Environment Impact Assessment (EIA) of our Marble Mine at Dist. Banswara, Rajasthan commissioned by Anil Kumar Choudhary.
  • Environment Impact Assessment (EIA) of Silica Sand Mines at Dist. Chitrakoot, (U.P.) commissioned by Allahabad Mineral Traders.
  • Environment Impact Assessment (EIA) of Silica Sand mines at Chitrakoot, (U.P.) commissioned by Raghunath Prasad.
  • Environment Impact Assessment (EIA) of Silica Sand mines at Chitrakoot, (U.P.) commissioned by Subhash Chandra Chawla.
  • Environment Impact Assessment (EIA) of Silica Sand Mines at Allahabad (U.P) commissioned by Rajesh Kumar Chawla.
  • Environment Impact Assessment (EIA) of sand stone mine at vill. Dhara, Dist. Mahoba, U.P commissioned by Smt. Nutan Singh.
  • Environment Impact Assessment (EIA) of our sand mine project at BhulsiKhadar, Dist.-Hamirpur, State-UP commissioned by Ramesh Chandra Mishra
  • Environmental Impact Assessment (EIA) of Limestone (Building Stone); ML No. 2/2011, Near Village Aroliya; District Jhalaar, State Rajasthan commissioned by Govind Duttatrey.
  • Environmental Impact Assessment (EIA) of Limestone (Building Stone); ML No. 35/2004, Near Village Chechat, District Kota, State Rajasthan commissioned by Govind Duttatrey.